Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-02195
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8910 W SHOUP DR
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(Unit 2 Building 13) This permit is for the construction of a new townhouse with three attached units. This is unit 2 that has a total of 1082 square feet with an attached garage of 308 square feet. The main level is 629 square feet with one bathroom, a kitchen and an office. The second level is 553 square feet with two bedroom and two bathrooms. Epoxy anchors are being used on the interior walls and these will require a special inspector's sign off that will be provided to the City of Boise inspector on site. SEE COMMENTS FOR ANCHOR INFO. The furnace has been placed in the attic space and will require a walkway in the attic and a working platform, see attached plan review report for details. The separation wall is built to WP 4136 as noted and detailed on the approved plans. This two hour wall may not have any penetrations, the columns in the garage must be placed inside the separation wall. R-2D zoning district, building setbacks, CUP07-00150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, red lining, engineering, and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/2/200911/3/200911/3/2009PPASS
DetailsMike Jordan
JIM Phone #: ###-####
DOC - Permit Finaled11/3/200911/3/200911/3/2009PPASS
DetailsMike Jordan
Cert. of occ. issued.
BLD-Final11/2/200911/2/200911/2/2009PFAIL
DetailsJim Storey
Jim Phone #: ###-####. maintane garage septration.
BLD-Conference5/19/20095/19/20095/19/2009PDONE
DetailsMike Jordan
BLD-Final4/9/20094/9/20094/9/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/9/2009 at 8:01:28 AM.
BLD-Other4/9/20094/9/20094/9/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/9/2009 at 8:01:28 AM. Verified installation of exterior weather barrier.
BLD-Framing/Rough-in4/3/20094/3/20094/3/2009ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/3/2009 at 6:07:31 AM.
BLD-Energy code compliance4/3/20094/3/20094/3/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/3/2009 at 6:07:31 AM. ok to cover
BLD-Energy code compliance4/2/20094/2/20094/2/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/2/2009 at 6:03:35 AM.
BLD-Framing/Rough-in4/1/20094/1/20094/1/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/1/2009 at 5:30:27 AM.
BLD-Framing/Rough-in4/1/20094/1/20094/1/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/1/2009 at 5:28:14 AM. Contact: ###-####. Scheduled for pm.
BLD-Framing/Rough-in3/17/20093/17/20093/17/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Nailing for both layers of 5/8 type x rock from ceiling to roof deck, both sides.
BLD-Framing/Rough-in3/16/20093/16/20093/16/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/16/2009 at 11:18:30 AM. Contact: ###-####.
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/4/20093/4/20093/4/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/4/2009 at 7:09:42 AM. Contact: ###-####.
BLD-Framing/Rough-in3/3/20093/3/20093/3/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 7:38:36 AM. Contact: ###-####.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. 2nd. floor, 2nd. later, remaining side of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009APASS
DetailsMike Jordan
jim Phone #: ###-####. 2nd. floor, 1st. layer, remaining side of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2009 at 8:26:20 AM. Contact: ###-####. 2nd. floor, 2nd layer of type x 5/8 rock, one side only for 2hr. fire wall.
BLD-Framing/Rough-in2/26/20092/26/20092/26/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire wall.
BLD-Framing/Rough-in2/11/20092/12/20092/12/2009PPASS
DetailsMike Jordan
jim - fire wall Phone #: ###-####. 1st. floor, 2nd layer type x rock for 2hr. wall, both sides.
BLD-Framing/Rough-in2/12/20092/12/20092/12/2009APART
DetailsMike Jordan
jim - fire wall Phone #: ###-####. 1st. floor, 1st. layer, type x rock for 2hr. wall, both sides.
BLD-Footing2/6/20092/9/20092/9/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/6/2009 at 4:13:52 PM. Contact: ###-####. Interior footings and column pad footings.
BLD-Energy code compliance1/29/20091/29/20091/29/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Rigid foam insul on interior side of stemwall. ok.
BLD-Foundation1/27/20091/27/20091/27/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####. Perimeter footings.