BLD-Final | 11/2/2009 | 11/3/2009 | 11/3/2009 | P | PASS |
Mike Jordan
|
|
|
JIM Phone #: ###-####
|
DOC - Permit Finaled | 11/3/2009 | 11/3/2009 | 11/3/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ. issued.
|
BLD-Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | FAIL |
Jim Storey
|
|
|
Jim Phone #: ###-####. maintane garage septration.
|
BLD-Conference | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/9/2009 at 8:01:28 AM.
|
BLD-Other | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/9/2009 at 8:01:28 AM. Verified installation of exterior weather barrier.
|
BLD-Framing/Rough-in | 4/3/2009 | 4/3/2009 | 4/3/2009 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/3/2009 at 6:07:31 AM.
|
BLD-Energy code compliance | 4/3/2009 | 4/3/2009 | 4/3/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/3/2009 at 6:07:31 AM. ok to cover
|
BLD-Energy code compliance | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/2/2009 at 6:03:35 AM.
|
BLD-Framing/Rough-in | 4/1/2009 | 4/1/2009 | 4/1/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/1/2009 at 5:30:27 AM.
|
BLD-Framing/Rough-in | 4/1/2009 | 4/1/2009 | 4/1/2009 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/1/2009 at 5:28:14 AM. Contact: ###-####. Scheduled for pm.
|
BLD-Framing/Rough-in | 3/17/2009 | 3/17/2009 | 3/17/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Nailing for both layers of 5/8 type x rock from ceiling to roof deck, both sides.
|
BLD-Framing/Rough-in | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/16/2009 at 11:18:30 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:09:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/3/2009 at 7:38:36 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 2nd. floor, 2nd. later, remaining side of 5/8 type x rock for 2hr. fire wall.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 2nd. floor, 1st. layer, remaining side of 5/8 type x rock for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 8:26:20 AM. Contact: ###-####. 2nd. floor, 2nd layer of type x 5/8 rock, one side only for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/11/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Mike Jordan
|
|
|
jim - fire wall Phone #: ###-####. 1st. floor, 2nd layer type x rock for 2hr. wall, both sides.
|
BLD-Framing/Rough-in | 2/12/2009 | 2/12/2009 | 2/12/2009 | A | PART |
Mike Jordan
|
|
|
jim - fire wall Phone #: ###-####. 1st. floor, 1st. layer, type x rock for 2hr. wall, both sides.
|
BLD-Footing | 2/6/2009 | 2/9/2009 | 2/9/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/6/2009 at 4:13:52 PM. Contact: ###-####. Interior footings and column pad footings.
|
BLD-Energy code compliance | 1/29/2009 | 1/29/2009 | 1/29/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Rigid foam insul on interior side of stemwall. ok.
|
BLD-Foundation | 1/27/2009 | 1/27/2009 | 1/27/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####. Perimeter footings.
|