Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02202
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8879 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(UNIT 3 BUILDING 16) This permit is for the construction of a new townhouse with four attached units. This is unit 3 that has a total of 1396 square feet with an attached garage of 431 square feet. The main level is 624 square feet with one bathroom, a kitchen, and a covered front porch of 48 square feet. The second story is a total of 772 with three bedrooms and two bathrooms. The separation wall will continue to the end of the wall that separates the front porches and continue through to the roof deck as noted on plans. Epoxy anchors are being used on the interior walls and these will require a special inspector's sign off that will be provided to the City of Boise inspector on site. SEE COMMENTS FOR ANCHOR INFO. The furnace has been placed in the attic space and will require a walkway in the attic and a working platform, see attached plan review report for details. The separation wall is built to WP 4136 as noted and detailed on the approved plans. This two hour wall may not have any penetrations, the columns in the garage must be placed inside the separation wall. R-2D zoning district, building setbacks, CUP07-00150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, red lining, engineering and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/200911/30/200911/30/2009APASS
DetailsMike Jordan
call Jim Phone #: ###-#### Internet Inspection Request from: James Larkin
DOC - Permit Finaled11/30/200911/30/200911/30/2009PPASS
DetailsMike Jordan
cert. of occ. was issued.
BLD-Other4/3/20094/3/20094/3/2009PPASS
DetailsMike Jordan
Jim- building wrap Phone #: ###-####. Verified installation of eather resitive barrier. ok
BLD-Framing/Rough-in3/23/20093/23/20093/23/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/23/2009 at 6:13:13 AM. Contact: ###-####.
BLD-Energy code compliance3/23/20093/23/20093/23/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/23/2009 at 6:13:13 AM. Contact: ###-####. ok for cover.
BLD-Framing/Rough-in3/20/20093/20/20093/20/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/20/2009 at 7:03:36 AM. Contact: ###-####. ok to insul.
BLD-Framing/Rough-in3/9/20093/9/20093/10/2009PPASS
DetailsMike Jordan
Nailing for both layers of 5/8 type x rock from ceiling to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009APASS
DetailsMike Jordan
Attachment of 5/8 typex rock for 2hr. firewalls at overbuild areas.
BLD-Framing/Rough-in2/24/20092/25/20092/25/2009ANR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/24/20092/24/2009ACANC
DetailsMike Jordan
Jim This inspection is for the fire wall Phone #: ###-####
BLD-Framing/Rough-in2/23/20092/23/20092/23/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. 2nd floor, 2nd. layer type x rock both sides.
BLD-Framing/Rough-in2/20/20092/20/20092/20/2009PPART
DetailsMike Jordan
2nd.floor, 1st.layer, one side only, type x rock. for 2he. wall.
BLD-Framing/Rough-in2/19/20092/20/20092/20/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2009 at 9:55:03 PM. Contact: ###-####.
BLD-Framing/Rough-in2/19/20092/19/20092/19/2009PNR
DetailsMike Jordan
jim - firewalls Phone #: ###-####
BLD-Framing/Rough-in2/18/20092/19/20092/19/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/18/2009 at 10:09:27 PM. Contact: ###-####.
BLD-Framing/Rough-in2/18/20092/18/20092/18/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 2nd. layer, both sides type x rock for 2hr. wall.
BLD-Framing/Rough-in2/17/20092/17/20092/17/2009PPART
DetailsMike Jordan
Jim- Fire wall Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock for 2hr. wall, both sides.
BLD-Footing2/12/20092/12/20092/12/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/12/2009 at 7:40:08 AM. Contact: ###-####. Interior footings ok.
BLD-Energy code compliance2/2/20092/3/20092/3/2009APASS
DetailsMike Jordan
jim Phone #: ###-####. rigid foam insul. on interior side of stemwall. ok.
BLD-Foundation1/29/20091/29/20091/29/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/29/2009 at 7:30:46 AM. Contact: ###-####.
BLD-Foundation1/27/20091/28/20091/28/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Foundation1/22/20091/23/20091/23/2009PNR
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/20/20091/21/20091/21/2009APASS
DetailsMike Jordan
Jim-###-####. Exterior perimeter footings.