BLD-Final | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ issued.
|
BLD-Final | 12/1/2009 | 12/1/2009 | 12/1/2009 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: James Larkin. Moved to PM.
|
BLD-Other | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | PASS |
Mike Jordan
|
|
|
Jim- building wrap Phone #: ###-####. Verified installation of weather resistive barrier. ok.
|
BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. ok to rock.
|
BLD-Framing/Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. ok to insul.
|
BLD-Energy code compliance | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | CANC |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 10:02:21 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | NR |
Mike Jordan
|
|
|
jim - firewalls Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:13:16 PM. Contact: ###-####. 1st. layer type x rock for 2hr. wall from ceiling to roof deck, also verified nailing on type x rock at overbuild sections and rated plywood for 4ft. parapet at overbuild sections.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd floor, 2nd layer, both sides type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
Jim- Fire wall Phone #: ###-####. 2nd. floor, remaining side.
|
BLD-Framing/Rough-in | 2/11/2009 | 2/13/2009 | 2/17/2009 | P | PART |
Mike Jordan
|
|
|
jim - fire wall Phone #: ###-####. 2nd. floor, 5/8 type x rock one side for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock for 2hr. wall, both sides.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock for 2hr. wall remaining side.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock on 2hr. wall. one side only.
|
BLD-Energy code compliance | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. Rigid insul. at interior side of stemwall.
|
BLD-Foundation | 1/22/2009 | 1/22/2009 | 1/22/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 1/21/2009 | 1/22/2009 | 1/22/2009 | A | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####. Rescheduled for pm.
|
BLD-Framing/Rough-in | 1/22/2009 | 1/22/2009 | 1/22/2009 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Footing | 1/20/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Mike Jordan
|
|
|
Jim-###-####. Exterior perimeter footings.
|