This permit is to construct a new two story duplex. The total square footage is 1266 for unit A and 1429 for unit B. Unit A has 416 square feet on the main floor with one bathroom and an attached garage of 431 square feet. The second story is 850 square feet with three bedrooms and two bathrooms. The covered porches on front and back of unit A total 213 square feet. The main story of unit B is 606 square feet with one bathroom and an attached garage of 474 square feet. The second story is 823 square feet with three bedrooms and two bathrooms. The total of the front and back patios equal 431 square feet. All roof eaves that overhang to within five feet of the property line will be rated on the underneath side to one hour. The separation wall will be built to WP3370. The one hour floor/cieling assembly will be built to FC5407. The one hour walls supporting the floor/cieling assembly will be built to WP3660. All gypsum details are attached to the plans. R-1C zoning district, building setbacks and CAA08-00257 per Planning and Zoning. Built per all approved plans, red lining and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/9/20093/9/20093/9/2009PPASS
DetailsJim Storey
final ok l/c isued
DOC - Permit Finaled3/9/20093/9/20093/9/2009PPASS
DetailsJim Storey
BLD-Final2/26/20093/2/20093/2/2009APASS
DetailsJim Storey
Andy Phone #: ###-#### pending plm/zonning bond/
BLD-Conference2/26/20092/27/20092/27/2009APASS
DetailsTom Arcoraci
Andy Phone #: ###-####
BLD-Energy code compliance1/8/20091/8/20091/8/2009PPASS
DetailsDave Hannah
andy Phone #: ###-####
BLD-Framing/Rough-in1/5/20091/6/20091/6/2009PPASS
DetailsJim Storey
ANDY Phone #: ###-####
BLD-Framing/Rough-in12/22/200812/22/200812/22/2008PPASS
DetailsJim Storey
andy Phone #: ###-#### soffit protection ok to cover.
BLD-Framing/Rough-in12/3/200812/3/200812/3/2008PPART
DetailsJim Storey
andy Phone #: ###-#### gyp nailling walls ok
BLD-Conference12/2/200812/2/200812/2/2008PPASS
DetailsJim Storey
andy Phone #: ###-####
BLD-Footing11/17/200811/17/200811/17/2008PPASS
DetailsJim Storey
andy Phone #: ###-####
BLD-Footing11/13/200811/14/200811/14/2008PPASS
DetailsJim Storey
Andy-Stem wall inspection Phone #: ###-####
BLD-Footing11/13/200811/14/200811/14/2008APART
DetailsJim Storey
Andy Phone #: ###-####