Permit Information
Permit NumberBLD08-02383
StatusFinaled
Name K2 CONSTRUCTION
Site Address 833 W DIAMOND ST
Project NameECCO ELECTRONICS
Customer Number 
ePlanReviewNo
Description
(ECCO) Remodel to a portion of the existing 40,335 square foot first floor and a first time tenant improvement to the 9,230 square foot second floor. NOTE: This building is fully fire sprinklered for area increase. Work to the first floor to include: Adding new elevator, elevator equipment room constructed of 8" concrete smooth surface block on the exterior of the building , new Concore 2500 Access floor panel system in the server room, extending the existing server room walls to the underside of the second floor, construction of new walls for a lab area with a new door/tempered window, construction of new walls for a break room, and other misc. work per the plans. Work to the second floor to include: Construction of new walls for a new conference room, offices, mail room, smaller conference room, corridor with a breakroom/coffee station, one men's restroom, one women's restroom, one unisex restroom, and second floor framing construction for new HVAC and janitor/storage rooms. Second floor misc. work to include: New glass handrail, relocating a ducting chase, modifying the vestibule ceiling, slopeing gypcrete flooring down to plywood floor landings at both stairs, and adding office cubicels. All work per approved plans, Engineering, attached Plan review report, and CZC08-00167. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/15/20095/15/20095/15/2009PPASS
DetailsJim Storey
FIRE-Final Inspection5/15/20095/15/20095/15/2009PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection5/14/20095/14/20095/14/2009PPART
DetailsForrest France
EM lights and exit signs tested okay, fire life safety approved for final pending completion of fire alarm permit work.
BLD-Final5/12/20095/13/20095/14/2009PNR
DetailsJim Storey
kirk Phone #: ###-#### pending fire
FIRE-Final Inspection5/12/20095/13/20095/13/2009AFAIL
DetailsForrest France
Project related fire alarm permit work is not approved for final at this time.
BLD-Final5/4/20095/5/20095/7/2009PNR
DetailsJim Storey
herb Phone #: ###-####
FIRE-Final Inspection5/5/20095/6/20095/6/2009AFAIL
DetailsForrest France
Project related fire alarm and one attatched sprinkler permit are not ready for final at this time.
FIRE-Conference4/16/20094/17/20094/17/2009ADONE
DetailsForrest France
On site conference regarding exit sign locations, fire extinguishers, max. occupant load signage, status of project related fire sprinkler permit work, etc.
BLD-Other4/10/20094/10/20094/10/2009PPASS
DetailsMike Jordan
Herb- ceiling Phone #: ###-####
BLD-Framing/Rough-in3/24/20093/25/20093/25/2009APASS
DetailsJim Storey
Herb Phone #: ###-#### ceilling ok
BLD-Conference3/17/20093/17/20093/17/2009APART
DetailsJim Storey
reviewed handrail to meet code/ reviewed door modifacation in 1st floor production area for exit width in hall. arch. to submit change to plan review.
BLD-Framing/Rough-in2/10/20092/10/20092/10/2009PPASS
DetailsJim Storey
herb Phone #: ###-#### 1st floor wall at break rm ok pending ele insp./ hard lid framing ok to cover 2nd floor.
BLD-Energy code compliance1/27/20091/28/20091/28/2009APASS
DetailsJim Storey
herb Phone #: ###-####
BLD-Framing/Rough-in1/20/20091/20/20091/20/2009PPART
DetailsJim Storey
Herb Phone #: ###-#### framing ok pending plmb.
BLD-Footing12/30/200812/31/200812/31/2008APASS
DetailsTom Arcoraci
herb Phone #: ###-####
BLD-Footing12/24/200812/29/200812/29/2008APASS
DetailsJim Storey
erb Note: if possible 10:00 am Phone #: ###-####