BLD-Final | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Jim Storey
|
|
|
Please call at least an hour prior to inspection--Richard Hedge Phone #: ###-#### signed card on site final ok.
|
FIRE-Final Inspection | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | PASS |
Forrest France
|
|
|
Final fire life safety inspection passed.
|
BLD-Final | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | PART |
Jim Storey
|
|
|
Richard-temp occupancy phase 3 please Phone #: ###-#### temp ok need to chase it in basement.
|
BLD-Final | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | DEFR |
Jim Storey
|
|
|
Richard-temp occupancy phase 3 please Phone #: ###-#### out of time rolled over. to am.
|
FIRE-Final Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PART |
Forrest France
|
|
|
Phase two portion of the remodel area passed fire life safety inspection.
|
BLD-Final | 6/3/2009 | 6/3/2009 | 6/3/2009 | P | PART |
Jim Storey
|
|
|
richard - please call 1/2 hr prior Phone #: ###-#### first phase ok for occ.
|
BLD-Framing/Rough-in | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PART |
Jim Storey
|
|
|
Richard Phone #: ###-#### framing phase 1 ok pending ele
|