Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD08-02567
StatusFinaled
Name HC COMPANY INC
Site Address 3501 W ELDER ST
Project NameASSURANT HEALTH UNA MAS BLDG
Customer Number 
ePlanReviewNo
Description
(ASSURANT HEALTH) New 10,203 sq. ft. office space in an existing vacant shell space on the third floor of a 3 story building, with basement per approved plans. NOTE: This building is fully fire sprinklered for one-hour substitution. Work includes installation of interior non-bearing walls to create (13) private offices, (2) open office areas, (1) conference room, (1) Training room, (1) Breakroom, (1) File/Copy room, Millwork, installation of a suspended ceiling grid system, and miscellaneous finishes. Work also includes HVAC, Plumbing and Electrical. Common core restrooms & drinking fountains are located on each level W/ common service sink on third level, all part of Shell /Core permit (BLD06-00688). There is an existing central core to this building, approximately 780 sq. ft., which includes the three exit stair systems; and an elevator for accessibility compliance. Any modifications to the fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. All work per the approved plans, Engineering, and Plan Review report. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/27/20093/27/20093/27/2009PPASS
DetailsJim Storey
Please call one 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett final ok.
FIRE-Final Inspection3/26/20093/26/20093/27/2009PPASS
DetailsForrest France
Noted correction items verified for completion, fire life safety finaled.
FIRE-Final Inspection3/25/20093/25/20093/25/2009PFAIL
DetailsForrest France
Noted seven EM lights at the north and east sides of the tenant improvement remodel are not functional.
FIRE-Conference3/24/20093/24/20093/24/2009ADONE
DetailsForrest France
Regarding door hardware installation prior to final insp.
BLD-Other3/5/20093/6/20093/6/2009APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/5/2009 at 2:01:24 PM. Contact: ###-####.
BLD-Framing/Rough-in1/13/20091/13/20091/13/2009PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/13/2009 at 9:38:40 AM. Contact: ###-####. ok to cover/ need to verify fire stopping of ele at elavator shaft vending area/ reverse swing on main door on order.
BLD-Energy code compliance1/13/20091/13/20091/13/2009PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/13/2009 at 9:39:46 AM. Contact: ###-####.