Permit Number | BLD09-00257 |
Status | Finaled |
Name |
KING EXCAVATION
|
Site Address |
2913 S PHILLIPPI ST
|
Project Name | Boise Airport Shuttle Parking |
Customer Number | |
ePlanReview | No |
Description |
(Boise Airport Shuttle Parking Lot Expansion - Shelter 3) To construct a new 140 sq.ft. enclosed bus shelter structure. The exterior walls will be constructed with 8-inch CMU block walls, flush vertical seam metal panel wall system, metal panel soffit system, and a standing seam metal roofing system. All work per the approved plans, Engineering, and Plan review report. DRH08-00268 **SRZ**
|