Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD09-00267
StatusFinaled
Name ESI
Site Address 8200 W FAIRVIEW AVE
Project NameWinCo Food Store #06
Customer Number 
ePlanReviewNo
Description
WinCo Foods - Store #6 - Addition, Remodel and New Front Entrance Canopy- To demolish the west and a portion of the north exterior walls and construct a 14,700 square foot retail store addition on the west end of the building and a 1,410 square foot storage and receiving hallway addition on the northwest side of the building. To construct a new truck dock on the northwest side of the building and to construct new facade and entry canopy at the front of the building. The entire building will be remodeled and updated in phases. The remodel will include finishing the west addition, constructing a new 1,235 sq. ft. mechanical platform above a portion of the grocery storage area, to construct new dairy cooler and grocery freezer, construct new ice cream cases, demo and construct new bakery department, update public restrooms, demo and install new refrigeration cases and refrigerant piping, construct new coolers and freezers for the deli and meat departments, construct new main entry and exit areas, demo and construct new security and customer service areas and to relocate and install new checkstands and display shelving. New skylights will also be installed on the roof. This building was reviewed as an unlimited area building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/4/20102/5/20102/5/2010APASS
DetailsJim Sly
Jim, Troy was going to inspect around 8:30 am.Give me a call when you are available thanks Miles. Phone #: ###-#### Internet Inspection Request from: Miles Hash

OK for Perm Occ.
FIRE-Conference2/4/20102/5/20102/5/2010ADONE
DetailsTroy Cobbley
The inspection for FIR09-00423 has been completed.
BLD-Final2/3/20102/4/20102/4/2010ANR
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Miles Hash
Need fire (hood) final.
BLD-Final1/6/20101/7/20101/7/2010ANR
DetailsJim Sly
Building final Inspection Phone #: ###-#### Internet Inspection Request from: Mike Tsu
Need ACHD CGHD and Zoning finals.
FIRE-Final Inspection1/6/20101/6/20101/6/2010PPASS
DetailsTroy Cobbley
Fire life safety passed.
FIRE-Final Inspection1/5/20101/5/20101/5/2010PFAIL
DetailsTroy Cobbley
The exit discharge lighting, at the two new doors, has been connected to a photo sensor which is not allowed per code. They will need to be disconnected from any photo cells or timers. This is the only item left for a final sign off of life safety.
FIRE-Final Inspection12/29/200912/30/200912/30/2009PFAIL
DetailsTroy Cobbley
See the city approved plans, Electrical sheets, for locations where exit lights and emergency lighting needs repaired. Also an additional emergency light needs to be added in the public accessible beer cooler. See sheet F2 for corrections marked in red where fire extinguisher locations need to be modified. The fire proofing in the "dog house" is acceptible and the product used was verified with Tim Frost.
FIRE-Final Inspection12/15/200912/15/200912/15/2009PCANC
DetailsTroy Cobbley
I had a conference with the building contractor about needing the data sheet for the fire proofing applied in the dog house area and also not all of the wood has been covered in the dog house area. No othe life safety items have been inspected.
BLD-Wall cover10/23/200910/23/200910/23/2009PCANC
DetailsJim Sly
Top level of sheeting on exit corridor Phone #: ###-#### Internet Inspection Request from: Mike Tsu....1st layer OK
BLD-Concrete9/17/20099/18/20099/18/2009APART
DetailsJim Sly
Pour back section of slabs at Phase 2C at 3:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK .... pend MTI insp, tests and approvals.
BLD-Concrete8/21/20098/24/20098/24/2009APART
DetailsJim Sly
Pourback of interior Wall of value slab area at 4:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pendin special insp MTI tests and approvals.
BLD-Framing/Rough-in8/21/20098/24/20098/24/2009APART
DetailsJim Sly
Framing of front center canopy section and rear deli wall Phone #: ###-#### Internet Inspection Request from: Mike Tsu......Center canopy Framing...OK
BLD-Concrete7/30/20097/31/20097/31/2009APASS
DetailsMike Jordan
Pourback dairy section interior slab at 8:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
BLD-Framing/Rough-in7/30/20097/30/20097/30/2009PPART
DetailsMike Jordan
Wall framing at Bakery and front facade framing at SW side. Phone #: ###-#### Internet Inspection Request from: Mike Tsu. Framing at bakery, pend. elec. Also front facade on west end.
BLD-Concrete7/20/20097/21/20097/21/2009APASS
DetailsTom Arcoraci
Pouring Produce deparment sales slab at 4:00 am. MTI scheduled to perform special inspections. Phone #: ###-#### Internet Inspection Request from: Mike Tsu
BLD-Concrete7/16/20097/17/20097/17/2009APART
DetailsJim Sly
Pouring interior slab patchback section at Phase 1C++ and rat slabs and Produce pad and curbs at 4:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pend MTI insp, tests and appr.
BLD-Concrete7/6/20097/7/20097/7/2009APART
DetailsJim Sly
Pouring AHU-2 Mezzanine Slab and rear wall footing at 7:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI insp,tests and appr.
BLD-Concrete7/1/20097/2/20097/2/2009APART
DetailsJim Sly
Pouring interior slab at Phase 1C+ at 4:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
BLD-Concrete6/29/20096/30/20096/30/2009APART
DetailsJim Sly
Pouring exit corridor slab at 5:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pend MTI spedial insp, tests and approvals.
BLD-Foundation6/23/20096/23/20096/23/2009PPASS
DetailsJim Storey
Pouring foundation curbs for front West Facade at 1:00 pm Phone #: ###-#### Internet Inspection Request from: Mike Tsu OK pending MTI special insp,tests and approvals. bar ok west end of front of store.
BLD-Concrete6/11/20096/12/20096/12/2009APART
DetailsJim Sly
Pour interior slab at Phase 1B at 4:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI special insp,tests and approvals.
BLD-Framing/Rough-in6/11/20096/11/20096/11/2009PPART
DetailsJim Sly
Cornise Framing Phone #: ###-#### Internet Inspection Request from: Mike Tsu
..........OK
BLD-Concrete6/11/20096/11/20096/11/2009PPART
DetailsJim Sly
Front support curb for Facade to pour at 2:30 pm Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI special inspections, tests and approvals.
BLD-Footing6/8/20096/9/20096/9/2009APART
DetailsJim Sly
Footing for front Facade at 7:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI special inspections, tests and approvals.
BLD-Footing6/4/20096/5/20096/5/2009ACANC
DetailsJim Sly
Interior pier footings for west addition to pour at 10:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI inspection, tests and approvals.
BLD-Framing/Rough-in5/21/20095/22/20095/22/2009APART
DetailsJim Sly
Temp shear wall framing Phone #: ###-#### Internet Inspection Request from: Mike Tsu Temp. Wall OK
BLD-Concrete5/21/20095/22/20095/22/2009APART
DetailsJim Sly
Rear Stockroom slab to pour a 6:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI special inspections, tests and approvals.
BLD-Concrete5/21/20095/21/20095/21/2009PPART
DetailsJim Sly
Pouring interior beer slab at 2:00 pm Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK pending MTI special inspections, tests and approvals.
BLD-Footing5/13/20095/14/20095/14/2009PPASS
DetailsJim Sly
Continuous footing for West addition. Pour scheduled at 1:00pm - Mike Tsu Phone #: ###-#### Internet Inspection Request from: Mike Tsu
OK Pending MTI special inspections, tests and approvals.
BLD-Concrete5/8/20095/11/20095/11/2009APART
DetailsJim Sly
Mike Tsu Phone #: ###-#### Internet Inspection Request from: Mike Tsu
Pad for New Compactor....OK pending MTI special inspections, tests and approvals.