BLD-Final | 8/26/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Dave Hannah
|
|
|
Brabdon Phone #: ###-####
|
DOC - Permit Finaled | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/26/2009 | 8/27/2009 | 8/27/2009 | A | DEFR |
Forrest France
|
|
|
Permit details do not indicate any project required fire inspection signatures are applicable.
|
BLD-Framing/Rough-in | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
BLD-Energy code compliance | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 5/27/2009 | 5/27/2009 | 5/28/2009 | P | PART |
Dave Hannah
|
|
|
Brandon Phone #: ###-#### c/n on site ok to insulate
|
BLD-Concrete | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PASS |
Jim Sly
|
|
|
Brandon-fire rated sofit inspection please Phone #: ###-#### Rated soffits OK
|
BLD-Foundation | 4/30/2009 | 5/1/2009 | 5/1/2009 | A | PASS |
Dave Hannah
|
|
|
chris Phone #: ###-####
|
BLD-Footing | 4/30/2009 | 4/30/2009 | 4/30/2009 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|