BLD-Final | 6/23/2010 | 6/24/2010 | 6/24/2010 | P | PASS |
Jim Sly
|
|
|
Travis please call before going out Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Forrest France
|
|
|
Verified knox box is installed as needed per most recent fire life safety inspection activity note.
|
FIRE-Final Inspection | 6/10/2010 | 6/11/2010 | 6/11/2010 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with marks and scotts permission until the knox key box thay is on order is received and installed.
|
BLD-Final | 6/11/2010 | 6/11/2010 | 6/11/2010 | P | PART |
Jim Sly
|
|
|
Travis Phone #: ###-#### OK for Temp.......When Fire OK's for Temp Occ.
|
BLD-Final | 6/10/2010 | 6/11/2010 | 6/11/2010 | A | CANC |
Jim Sly
|
|
|
Travis phone
|
FIRE-Final Inspection | 6/9/2010 | 6/10/2010 | 6/10/2010 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints. Rescheduled for tomorrow morning.
|
BLD-Conference | 6/9/2010 | 6/10/2010 | 6/10/2010 | P | DONE |
Jim Sly
|
|
|
travis Phone #: ###-####
|
BLD-Conference | 6/7/2010 | 6/8/2010 | 6/8/2010 | A | CANC |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
FIRE-Conference | 6/7/2010 | 6/8/2010 | 6/8/2010 | A | DONE |
Troy Cobbley
|
|
|
I went over live safety requirements which included a knox box, manual locks on the interior doors, fire extinguishers and exit signs/emergency lights.
|
FIRE-Final Inspection | 6/4/2010 | 6/7/2010 | 6/7/2010 | P | CANC |
Troy Cobbley
|
|
|
Travis Phone #: ###-####-Cancel by Travis
|
BLD-Conference | 6/4/2010 | 6/4/2010 | 6/4/2010 | P | DONE |
Jim Sly
|
|
|
Travis Phone #: ###-#### Met with Travis....I told him again that the Architect of record needs to re-design the entire West side of Bldg. at exterior for landings, ramps, sidewalks and handrails. Architect to submit drawings to PDS dept. for approval.
|
BLD-Conference | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | DONE |
Jim Sly
|
|
|
Travis Phone #: ###-#### Talked about Sidewalks, landings and handicap ramp. Nothing on approved plan. Architect to submit plans to plan review for approval.
|
BLD-Energy code compliance | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Framing/Rough-in | 2/9/2010 | 2/10/2010 | 2/10/2010 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
FIRE-Final Inspection | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type set up.
|
BLD-Framing/Rough-in | 2/3/2010 | 2/4/2010 | 2/5/2010 | P | PART |
Jim Sly
|
|
|
Travis Phone #: ###-#### OK to insulate......Need Architect to resubmit floor plan for approval showing minor wall configuration changes prior to allowing OK to cover framing.
|
BLD-Framing/Rough-in | 2/2/2010 | 2/3/2010 | 2/3/2010 | A | FAIL |
Jim Sly
|
|
|
Travis Phone #: ###-#### Partial insp only. C/N...Obtain Fire alarm permit and insp. Lat brace A3G truss Need to provide new RP for erosion Interior wall configuration does not match copied plan. Provide stamped "approved" plan with all plan check notes. Fireblock double wall at Laundry. Partial framing insp. only.
|
Extend Permit 180 days | | 1/15/2010 | 1/19/2010 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PART |
Jim Sly
|
|
|
travis - shear reinspection - please call with results Phone #: ###-#### C/N Partial shear insp only...Exterior and interior shear wall nailing OK above floor line. Contractor to ascertain that all J bolts, hold down devices and straps are in place prior to calling for insp of walls.... and pony walls in crawlspace. Provide letter for special insp of epoxy bolting at next inspection.
|
BLD-Framing/Rough-in | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | FAIL |
Jim Sly
|
|
|
travis - shear Phone #: ###-#### C/N.....Exterior shear nailing.......Re-nail at 6" and 12"... all nails that are overdriven. Need special inspection of all epoxy installed retrofit hold downs. Provide copy of inspections for Structural inspector.
|
BLD-Other | 8/14/2009 | 8/14/2009 | 8/14/2009 | A | FAIL |
Jim Sly
|
|
|
On 8/4 and 8/11/2009 site visits were performed to review general framing provisions as required by 2006 IBC. CN's issued on observed deficiencies.
|
BLD-Conference | 7/21/2009 | 7/21/2009 | 7/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
Travis--change of GC''s need to document stage of permit @time time of change of GC Phone #: ###-#### buildib is rough frme with no rough ins done
|
BLD-Conference | 7/20/2009 | 7/21/2009 | 7/21/2009 | A | PASS |
Tom Arcoraci
|
|
|
Michael from Capital City called and said that him and the owner had a falling out and they are no longer doing the job but the owner has already hired someone else and they have begun work under Capital City''s permit. Michael wants the job tagged until the GC is changed on the permit. We need letter stating Capital City is not doing the job and the new GCs info. Phone #: ###-#### informed owner to change gen contractor at city,told old general that owner was going to do so, there is no work going on at this time
|
BLD-Conference | 6/8/2009 | 6/9/2009 | 6/9/2009 | A | DONE |
Jim Sly
|
|
|
michael Phone #: ###-####
|
BLD-Conference | 5/18/2009 | 5/18/2009 | 5/18/2009 | P | DONE |
Jim Sly
|
|
|
MICHAEL Phone #: ###-#### Poured new approx 40' footing in crawlspace......8' South of previously poured footing. New Engineering provided. Footing OK.
|
BLD-Foundation | 5/7/2009 | 5/7/2009 | 5/7/2009 | P | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|