BLD-Final | 6/10/2009 | 6/10/2009 | 6/10/2009 | P | PASS |
Jim Storey
|
|
|
j.c. Phone #: ###-#### card signed on site.
|
FIRE-Final Inspection | 6/10/2009 | 6/10/2009 | 6/10/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety completed satisfactory.
|
BLD-Framing/Rough-in | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-#### ok to rock pending resub.
|
BLD-Framing/Rough-in | 4/28/2009 | 4/28/2009 | 4/28/2009 | P | PART |
Jim Storey
|
|
|
JC Phone #: ###-#### arch to submit for plan modifacation to plan review as to rated wall assemblies locations, protection required/ deletion of partion walls out side of restroom.
|