BLD-Final | 10/1/2009 | 10/2/2009 | 10/2/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 10/1/2009 | 10/2/2009 | 10/2/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | PASS |
Tom Arcoraci
|
|
|
Mike Phone #: ###-####
|
FIRE-Final Inspection | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | FAIL |
Troy Cobbley
|
|
|
All life safety items are ok except not all of the resident room doors release/close upon activation of the fire alarm system. Contractor was going to tighten hinges and call in for tomorrow.
|
BLD-Framing/Rough-in | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Wall cover | 9/11/2009 | 9/14/2009 | 9/14/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### rm 16 ok as well as hard pipe for exsust fan to exterior/ all rms marked ok on aproved plan execpt mech rm.
|
BLD-Wall cover | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | CANC |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Wall cover | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | CANC |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | CANC |
Jim Storey
|
|
|
Mike Phone #: ###-#### rolled to am
|
BLD-Framing/Rough-in | 9/4/2009 | 9/8/2009 | 9/8/2009 | A | PASS |
Jim Storey
|
|
|
mike Phone #: ###-#### as noted on plans.
|
BLD-Framing/Rough-in | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### bath rm ok riiserm and ajasent to the west ok noted on plan.
|
BLD-Framing/Rough-in | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 8/25/2009 | 8/26/2009 | 8/26/2009 | A | PART |
Jim Sly
|
|
|
Mike Phone #: ###-#### Finished Ceilings OK...5 rooms as marked on plans.
|
BLD-Framing/Rough-in | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PART |
Jim Sly
|
|
|
Mike Phone #: ###-#### OKd 1st layer ceilings on (2) rooms marked on plans
|
BLD-Framing/Rough-in | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-#### 1 st layer ok/ part of 2nd layer ok and ok to continue as noted on plan and signed 301.
|
BLD-Framing/Rough-in | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-#### first later of gyp south side of lobby coridor ok to cover with gyp/ ceilling in rm 3 ok to drop upon ele sign off.
|
BLD-Framing/Rough-in | 8/12/2009 | 8/13/2009 | 8/13/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### 2nd layer of gyp on ceilling rm 3 ok
|
BLD-Framing/Rough-in | 8/10/2009 | 8/11/2009 | 8/11/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### 1 st layer of gyp oncielling ok activity 3 rm.
|
BLD-Framing/Rough-in | 8/7/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### rm s as signed off on aproved plan ok
|
BLD-Framing/Rough-in | 8/4/2009 | 8/5/2009 | 8/5/2009 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### two rms signed off on plan south end of bld/
|
BLD-Wall cover | 7/31/2009 | 7/31/2009 | 7/31/2009 | P | PART |
Jim Storey
|
|
|
class room 3 and final sheet rock on classroom 4 please-Mike Phone #: ###-####gyp ok 2 nd layer
|
BLD-Framing/Rough-in | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | CANC |
Jim Storey
|
|
|
class room 3 and final sheet rock on classroom 4 please-Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2009 | 7/29/2009 | 7/29/2009 | A | PART |
Mike Jordan
|
|
|
mike - southeast section Phone #: ###-####. 1st. layer ok.
|
BLD-Framing/Rough-in | 7/24/2009 | 7/27/2009 | 7/27/2009 | P | PART |
Tom Arcoraci
|
|
|
Mike please call 1/2 hr before going out Phone #: ###-####wip ok
|
BLD-Other | 7/27/2009 | 7/27/2009 | 7/27/2009 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Conference | 7/21/2009 | 7/22/2009 | 7/22/2009 | A | PASS |
Tom Arcoraci
|
|
|
Mike Phone #: ###-####
|