Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD09-00511
StatusFinaled
Name LEVEL CONSTRUCTION LLC
Site Address 516 W HALE ST STE 105 & 205
Project NameICONIC VILLAGE
Customer Number 
ePlanReviewNo
Description
(Building I - 516 W. Hale St units 105 & 205) This project is to convert an existing two bedroom, one bathroom, two story apartment unit into (2) one bedroom, one bathroom units. Work to include: Minor demolition, new non-load bearing partitions, electrical modifications, paint and floor finishes, new automatic fire sprinkler system installed throughout in accordance with NFPA 13R, new bathroom (first floor unit), new kitchenette (second floor unit), and a sixteen square foot addition for the fire riser room will be added to the building. A phased upgrade agreement is approved and attached for the automatic sprinkler system improvements. All other alterations related to this building are permitted under BLD09-00017, BLD09-00508, BLD09-00509, and BLD09-00510. All work per approved plans and attached plan review report. The occupant load calculated under this permit is only for the units being remodeled/added. DRH08-00152, CUP08-00073, and CZC09-00047 per planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20116/10/20116/10/2011APASS
DetailsJim Storey
Andy Phone #: ###-####
DOC - Permit Finaled6/10/20116/10/20116/10/2011PPASS
DetailsJim Storey
FIRE-Final Inspection6/9/20116/10/20116/10/2011APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/8/20116/9/20116/9/2011PPASS
DetailsTroy Cobbley
life safety passed
BLD-Conference5/9/20115/10/20115/10/2011APASS
DetailsJim Storey
Andy Phone #: ###-####
BLD-Aging Inspection3/7/20113/7/20113/10/2011 PASS
DetailsJim Storey
BLD-Aging Inspection1/3/20111/3/20111/3/2011 PASS
DetailsJim Storey
BLD-Aging Inspection11/1/201011/1/201011/1/2010 PASS
DetailsJim Storey
Takled with andy the contractor and work is in progress on this permit finals will be in about two weeks plm contractor is gone and permit is being reisued to get job back on tract.
BLD-Conference11/1/201011/1/201011/1/2010APASS
DetailsJim Storey
Takled with andy the contractor and work is in progress on this permit finals will be in about two weeks plm contractor is gone and permit is being reisued to get job back on tract.
BLD-Aging Inspection8/30/20108/30/20108/30/2010 PASS
DetailsJim Storey
Takled with andy the contractor and work is in progress on this permit finals will be in about two weeks plm contractor is gone and permit is being reisued to get job back on tract.
BLD-Aging Inspection6/28/20106/28/20106/29/2010 PASS
DetailsJim Storey
andy is checking w/owner
BLD-Conference6/28/20106/29/20106/29/2010APASS
DetailsJim Storey
andy is checking w/owner
BLD-Aging Inspection4/27/20104/27/20104/29/2010 PASS
DetailsJim Storey
BLD-Aging Inspection2/23/20102/23/20102/23/2010 PASS
DetailsJim Storey
BLD-Energy code compliance11/30/200911/30/200911/30/2009PPASS
DetailsJim Storey
BLD-Energy code compliance11/17/200911/18/200911/18/2009ANR
DetailsJim Storey
ANDY Phone #: ###-####
BLD-Framing/Rough-in11/13/200911/13/200911/13/2009PPASS
DetailsJim Storey
andy Phone #: ###-####
BLD-Aging Inspection10/27/200910/27/200910/28/2009 NR
DetailsJim Storey
BLD-Aging Inspection8/27/20098/27/20098/27/2009 NR
DetailsJim Storey