BLD-Final | 9/11/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
DOC - Permit Finaled | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | CANC |
Dave Hannah
|
|
|
pat Phone #: ###-####
|
BLD-Final | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PART |
Dave Hannah
|
|
|
pat - fireplace Phone #: ###-#### ok to final after fire places are finaled
|
BLD-Conference | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Conference | 7/31/2009 | 8/4/2009 | 8/5/2009 | P | PASS |
Dave Hannah
|
|
|
michael Phone #: ###-#### conf on hillside and drainage,, call 415 1st
|
BLD-Conference | 7/31/2009 | 7/31/2009 | 7/31/2009 | P | PART |
Tony Young
|
|
|
michael Phone #: ###-#### drain issues,, need to talk w/ 425 ,, may not get 2% drainage away but be able to use drain system instead,, will need 6" reveal to wood frame
|
BLD-Energy code compliance | 7/7/2009 | 7/8/2009 | 7/8/2009 | A | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2009 | 7/6/2009 | 7/6/2009 | A | PASS |
Dave Hannah
|
|
|
pat Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 7/1/2009 | 7/2/2009 | 7/6/2009 | P | PART |
Dave Hannah
|
|
|
pat Phone #: ###-#### needs seal package but framing ok
|
BLD-Framing/Rough-in | 6/4/2009 | 6/4/2009 | 6/5/2009 | P | PART |
Dave Hannah
|
|
|
Pat Phone #: ###-#### shear ok to cover ext walls
|
BLD-Footing | 6/1/2009 | 6/2/2009 | 6/2/2009 | A | PASS |
Dave Hannah
|
|
|
Brent Phone #: ###-#### deck peirs ok to pour
|