Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-00653
StatusFinaled
Name PERKINS CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCapital H.S. bleachers
Customer Number918
ePlanReviewNo
Description
(CAPITAL HIGH SCHOOL BLEACHERS) Limited site work demolition. Improve softball field by installing new concrete pads for bleachers. Installation of (2) bleacher units, five rows high by 21' in length and (1) unit of bleachers 8 rows high by 21'; install a 5' x 18' cantilevered roof system for scorers table protection at top of 8 row bleachers; install perimeter guard rails with chain link fencing infill; handrails, seat planks, etc. per the reviewed plans, all in accordance with the 2006 IBC, ASCE 7-05 and ICC-300 Standard for Bleachers, 2002 edition. Install new dugouts, seating, fencing, backstop, HI-LO drinking fountain and modify electrical for current and future needs. drs ESC09-00148
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/21/20099/21/20099/21/2009PPASS
DetailsJim Sly
Joe Phone #: ###-####
DOC - Permit Finaled9/21/20099/21/20099/21/2009PPASS
DetailsJim Sly
FIRE-Final Inspection9/17/20099/18/20099/18/2009APASS
DetailsForrest France
Life safety inspection passed, note: signature card not available on site.
BLD-Final9/17/20099/17/20099/17/2009PPEND
DetailsJim Sly
Talked to Joe ###-#### dab-gbch about calling for Fire final, ESC final and Bldg final on Bleachers....he said he would.
BLD-Final9/11/20099/17/20099/17/2009ACANC
DetailsJim Sly
Re-sched......
BLD-Final9/10/20099/11/20099/11/2009ACANC
DetailsJim Sly
Re-sched