BLD-Final | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | PASS |
Jim Sly
|
|
|
KAthy Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PASS |
Forrest France
|
|
|
Correction verified for completion, inspection passed.
|
BLD-Final | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | NR |
Jim Sly
|
|
|
Talked to Contractor (OFFICE).....Need Fire, Zoning, P/W, Prior to Bldg final.
|
FIRE-Final Inspection | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | FAIL |
Troy Cobbley
|
|
|
Per a phone conversation with cathy the city approved plans are not on site. I went by the project just to verify fire dept access signage and found the curbing newly painted but no "No Parking-Fire Lane" signage had been redone. I called cathy back and notified her that this signage would be a requirement and to call in the inspection again when the plans became available.
|