BLD-Final | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PASS |
Mike Jordan
|
|
|
Inspection requested from web by: James Larkin Phone #: ###-####
|
DOC - Permit Finaled | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of occupancy issued.
|
BLD-Energy code compliance | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 2/18/2010 | 2/18/2010 | 2/18/2010 | P | PASS |
Mike Jordan
|
|
|
ian Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2010 | 2/18/2010 | 2/18/2010 | P | PASS |
Mike Jordan
|
|
|
ian Phone #: ###-####
|
BLD-Energy code compliance | 2/18/2010 | 2/18/2010 | 2/18/2010 | A | NR |
Mike Jordan
|
|
|
insulation contractor should be done around 11:00. If you can wait until 11:00, that would be awsome! Will reschedule for this afternoon.
Thanks Jim Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD-Framing/Rough-in | 2/17/2010 | 2/18/2010 | 2/18/2010 | A | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 2/17/2010 | 2/17/2010 | 2/17/2010 | P | NR |
Jim Storey
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/17/2010 | 2/17/2010 | 2/17/2010 | P | NR |
Jim Storey
|
|
|
jim Phone #: ###-####
|
BLD-Wall cover | 2/4/2010 | 2/5/2010 | 2/5/2010 | A | NR |
Mike Jordan
|
|
|
Wall Cover Phone #: ###-#### Internet Inspection Request from: James Larkin
|
BLD-Wall cover | 2/2/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Mike Jordan
|
|
|
House Wrap Phone #: ###-#### Internet Inspection Request from: James Larkin. Work in progress on installing the exterior weather resistive barrier.
|
BLD-Framing/Rough-in | 1/28/2010 | 1/28/2010 | 1/28/2010 | P | CANC |
Jim Sly
|
|
|
Jim this is for dire wall inspection Phone #: ###-#### Canc by Contr.
|
BLD-Framing/Rough-in | 1/21/2010 | 1/21/2010 | 1/21/2010 | P | PASS |
Mike Jordan
|
|
|
Fire wall inspection please-Jim Phone #: ###-####. FAce layer of 5/8 type x rock for 2hr. firewall. Also verified fire treated plywood for laydown parapet.
|
BLD-Framing/Rough-in | 1/20/2010 | 1/20/2010 | 1/21/2010 | P | PART |
Mike Jordan
|
|
|
JIm-Fire wall construction inspection please Phone #: ###-####. BAse layer of 5/8 type x rock for 2hr. fire wall.
|
BLD-Framing/Rough-in | 1/18/2010 | 1/19/2010 | 1/19/2010 | A | PASS |
Mike Jordan
|
|
|
Fire Wall consruciton / Overbuild Areas Phone #: ###-#### Internet Inspection Request from: James Larkin. Base and face layers of 5/8 type x rock for two hr. fire walls, also at overbuild areas as well. Also verified fire rated ply at laydown parapet.
|
BLD-Framing/Rough-in | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | NR |
Mike Jordan
|
|
|
Firewall construction Phone #: ###-#### Internet Inspection Request from: James Larkin
|
BLD-Framing/Rough-in | 1/15/2010 | 1/15/2010 | 1/15/2010 | A | CANC |
Mike Jordan
|
|
|
Firewall cunstruction Phone #: ###-#### Internet Inspection Request from: James Larkin Inspection cancelled from web by: James Larkin
|
BLD-Framing/Rough-in | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | NR |
Mike Jordan
|
|
|
Firewall construction Phone #: ###-#### Internet Inspection Request from: James Larkin. Will reschedule.
|
BLD-Framing/Rough-in | 1/5/2010 | 1/5/2010 | 1/5/2010 | P | NR |
Mike Jordan
|
|
|
Jim-Fire wall construction inspection please Phone #: ###-####
|
BLD-Framing/Rough-in | 12/30/2009 | 12/30/2009 | 12/30/2009 | P | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, face layer of 5/8 type x rock, both sides for 2hr. firewall.
|
BLD-Framing/Rough-in | 12/23/2009 | 12/23/2009 | 12/23/2009 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: James Larkin. 2nd floor, base layer of 5/8 type x rock for 2hr. fire wall.
|
BLD-Framing/Rough-in | 12/23/2009 | 12/23/2009 | 12/23/2009 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: James Larkin
|
BLD-Framing/Rough-in | 12/8/2009 | 12/8/2009 | 12/8/2009 | P | PART |
Mike Jordan
|
|
|
Fire Wall construction Phone #: ###-#### Internet Inspection Request from: James Larkin. FAce layer of 5/8 typex rock, 1st. floor both sides for 2hr. fire wall.
|
BLD-Framing/Rough-in | 12/6/2009 | 12/7/2009 | 12/7/2009 | P | PART |
Mike Jordan
|
|
|
Fire Wall. Should be ready any time after 11:00 Phone #: ###-#### Internet Inspection Request from: James Larkin. 1st. floor, 1st. layer of 5/8 type x rock both sides for 2hr. firewall.
|
BLD-Framing/Rough-in | 12/4/2009 | 12/4/2009 | 12/4/2009 | P | NR |
Mike Jordan
|
|
|
Fire Wall Phone #: ###-#### Internet Inspection Request from: James Larkin
|
BLD-Foundation | 12/1/2009 | 12/1/2009 | 12/1/2009 | A | PART |
Mike Jordan
|
|
|
Please call if there are any problems. thanks Jim Phone #: ###-#### Internet Inspection Request from: James Larkin. wip on interior footings, to be place with slab on grade.
|
BLD-Energy code compliance | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Rigid foam insulation at interior side of stemwall.
|
BLD-Foundation | 11/20/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 11/18/2009 | 11/19/2009 | 11/19/2009 | A | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 11/18/2009 | 11/18/2009 | 11/18/2009 | P | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####. rescheduled for 11-19-09.
|