Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD09-00769
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 1444 S ENTERTAINMENT AVE Unit: 305
Project NameSTEVENS HENAGER COLLEGE
Customer Number 
ePlanReviewNo
Description
(STEVENS-HENAGER COLLEGE - 3rd Floor - East Suite #305) For a first time minor tenant improvement on the third floor of an existing shell building. This Office tenant space has a total of 982 square feet and will consist of three offices and a reception area with work to include: wall construction for office separation, installation of acoustical suspended ceiling, HVAC/mechanical work, electrical work, and misc. interior finish work. The core areas of this floor were finished under the shell and core permit (BLD06-01621). Sprinklers were used for height and story increase. This building is fully sprinklered. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by the Boise City Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20097/31/20097/31/2009PPASS
DetailsMike Jordan
greg Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection7/31/20097/31/20097/31/2009PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final7/29/20097/30/20097/30/2009PNR
DetailsMike Jordan
Greg Phone #: ###-####. Needs fire final.
FIRE-Final Inspection7/29/20097/30/20097/30/2009AFAIL
DetailsTroy Cobbley
The life safety will be ok to pass when the project related fire sprinkler permit has been taken off of a parcel hold.
BLD-Final7/28/20097/28/20097/28/2009PCANC
DetailsMike Jordan
greg Phone #: 949-963. Contractor called to cancel.
FIRE-Final Inspection7/27/20097/28/20097/28/2009ANR
DetailsForrest France
Noted project related fire alarm permit FIR09-00439 has not been inspected or finaled per activity notes. Per conversation with contractor this work has been tested on a previous permit, inspection defered for verification by T. Cobbley as agreed.
BLD-Framing/Rough-in6/4/20096/4/20096/4/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/4/2009 at 7:16:59 AM. Contact: ###-####. Steel studs for interior walls only. No grid.
BLD-Framing/Rough-in6/2/20096/2/20096/2/2009PNR
DetailsMike Jordan
Needs elec. ri insp. first.
BLD-Framing/Rough-in6/1/20096/2/20096/2/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/1/2009 at 4:28:09 PM. Contact: ###-####.