BLD-Final | 5/28/2009 | 5/29/2009 | 5/29/2009 | P | DONE |
Jim Sly
|
|
|
Complaint from neighbor........Went to site, Talked to owners (father and son)......Cosmetic work and clean up...ie....texturing, painting, ceramic tile and pouring a concrete slab. Permit not required.
|
FIRE-Final Inspection | 5/28/2009 | 5/29/2009 | 5/29/2009 | A | PASS |
Forrest France
|
|
|
Noted two items to be completed prior to structural final including post the max. occupant load sign per review notes at 66 and provide approved door hardware at the mens restroom per discussion. Also noted building is not fire sprinklered as indicated on review. Remainder of life safety items okayed.
|