BLD-Final | 9/22/2009 | 9/22/2009 | 9/22/2009 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 9/21/2009 | 9/22/2009 | 9/22/2009 | A | PASS |
Mike Jordan
|
|
|
marilyn Phone #: ###-#### x 231. All outstanding items have been repaired. Ok for perm occ.
|
FIRE-Final Inspection | 9/21/2009 | 9/21/2009 | 9/22/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Mark Sentenno a racking permit will not be required. All other items have been addressed.
|
FIRE-Conference | 7/1/2009 | 7/2/2009 | 7/2/2009 | A | PASS |
Troy Cobbley
|
|
|
I spoke to Dale again about changing the two warehouse doors to two 30".
|
FIRE-Conference | 6/26/2009 | 6/26/2009 | 6/29/2009 | P | DONE |
Troy Cobbley
|
|
|
Spoke to Dave about emergency ligt placement in warehouse
|
BLD-Conference | 6/23/2009 | 6/23/2009 | 6/23/2009 | P | PASS |
Troy Cobbley
|
|
|
I discussed new door hardware issues with the tenant.
|
BLD-Final | 6/8/2009 | 6/9/2009 | 6/9/2009 | A | FAIL |
Mike Jordan
|
|
|
Marilyn Please call 15 min before going out Phone #: ###-#### x231. Provide sticker above door to read "These doors to remain unlocked while building is occupied." Remove thumbturn and manual flushbolts from main entry/exit and provide approved hardware. Remove thumb turn and manual flush bolts from second set of doors at main entry or remove doors. Provide lever type hardware on both exit doors from warehouse, and remove manual flush bolt and provide automatic flush bolt on front exit from warehouse. Provide exterior landing from rear exit of warehouse. c/n issued.
|
FIRE-Final Inspection | 6/8/2009 | 6/8/2009 | 6/9/2009 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on both of the warehouse exit doors. Repair the exit sign and provide emergency lighting at the north warehouse exit door. Mount the fire extinguisher that is located in the front office. Apply for a racking storage permit.
|