Permit Information
Permit NumberBLD09-01035
StatusFinaled
Name HARRIS CONSTRUCTION
Site Address 1410 S ENTERTAINMENT AVE
Project NameSPECTRUM POINTE SHOPS
Customer Number 
ePlanReviewNo
Description
(MYSTIQUE THEATER) This building is NOT fire sprinklered. To create a restaurant / theater / gift shop within a new 4,686 square foot building shell. The building shell was constructed under permit BLD08-01078. Each dining room will have an occupant load less than 50. Work is to include 2 public restrooms accessible to the disabled, 1 employee restroom accessible to the disabled, a commercial kitchen, grease hood and duct, interior nonbearing walls, and finishes. Foam plastic is required to be separated from the interior of the building by an approved thermal barrier per 2006 IBC Section 2603.4 OR a proposed foam plastic assembly shall have passed a large-scale test per 2006 IBC Section 2603.9. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20101/20/20101/20/2010PPASS
DetailsMike Jordan
Jason Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection1/20/20101/20/20101/20/2010PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection1/19/20101/20/20101/20/2010AFAIL
DetailsTroy Cobbley
The duct smoke detector has been oriented incorrectly, has the wrong length of sample tube and does not shut down the hvac system when tested in heat mode.
FIRE-Final Inspection1/15/20101/15/20101/15/2010PFAIL
DetailsTroy Cobbley
This project was not ready for a final inspection so we performed a conference. A duct smoke detector will be required on RTU 4 along with the remote annunciator. Three doors need the correct single action hardware installed. Exit signs and emergency lights tested ok. The hood suppression system needs to be installed and tested as well as fire extinguishers installed.
BLD-Conference1/6/20101/6/20101/6/2010APASS
DetailsMike Jordan
Ceiling grid ok. wip on remainder of job. Almost ready for finals.
BLD-Other11/19/200911/19/200911/19/2009PCANC
DetailsMike Jordan
Jason Phone #: ###-####
BLD-Framing/Rough-in10/23/200910/26/200910/26/2009PNR
DetailsMike Jordan
jason - ceiling grid Phone #: ###-####. Needs other trades ri insp. first.
BLD-Framing/Rough-in9/17/20099/18/20099/18/2009PPASS
DetailsMike Jordan
jason Phone #: ###-####. All issues were resolved. ok to cover.
BLD-Framing/Rough-in9/11/20099/14/20099/14/2009APART
DetailsMike Jordan
Jason Phone #: ###-####. Needs to provide additional engineering for soffit to bottom of roof joist. Still needs plumbing ri insp. Mech contractor needs to pull mech permit. Also needs to add all backing in restrooms for ada equipment. Contractor will call back for anothrer framing insp.