BLD-Final | 10/27/2009 | 10/28/2009 | 10/28/2009 | A | PASS |
Jim Storey
|
|
|
Brett-Please call at least 30 mins in advance so he can meet ya there Phone #: ###-####
|
DOC - Permit Finaled | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 8/11/2009 | 8/11/2009 | 8/11/2009 | P | PASS |
Alexandra L. DeYoung
|
|
|
Per 301 framing approved see notes in energy inspection
|
BLD-Energy code compliance | 8/5/2009 | 8/6/2009 | 8/6/2009 | A | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####framing c/n made ok insulation ok
|
BLD-Framing/Rough-in | 8/4/2009 | 8/5/2009 | 8/5/2009 | A | FAIL |
Dave Hannah
|
|
|
Brett-Please call at least 30 mins prior to inspection Phone #: ###-#### c/n on site ok to insulate
|
BLD-Foundation | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Jim Storey
|
|
|
dave - around 2 if possible please Phone #: ###-####
|
BLD-Footing | 7/8/2009 | 7/8/2009 | 7/8/2009 | P | PASS |
Jim Storey
|
|
|
Dave--approx 2 if possible Phone #: ###-####
|