BLD-Aging Inspection | 4/12/2011 | 4/12/2011 | 4/15/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/8/2011 | 2/8/2011 | 2/8/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 12/8/2010 | 12/8/2010 | 12/8/2010 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/7/2010 | 12/7/2010 | 12/8/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/4/2010 | 10/4/2010 | 10/4/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/21/2010 | 7/22/2010 | 7/22/2010 | A | PASS |
Dave Hannah
|
|
|
Darrell Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 7/20/2010 | 7/21/2010 | 7/21/2010 | A | PASS |
Forrest France
|
|
|
C/N finished, scope of work complete. Fire life safety finaled.
|
FIRE-Final Inspection | 7/15/2010 | 7/19/2010 | 7/19/2010 | A | FAIL |
Troy Cobbley
|
|
|
A thumb turn manual dead bolt has been installed on the only exit from the procedure room. This hardware needs to be single action lever type. I was ok with this same hardware on on the secondary exit from the adjoining restroom since the primary exit has approved hardware.
|
BLD-Framing/Rough-in | 7/13/2010 | 7/13/2010 | 7/14/2010 | P | PASS |
Dave Hannah
|
|
|
Ceiling inspection please-Darrell Phone #: ###-####
|
BLD-Framing/Rough-in | 6/9/2010 | 6/9/2010 | 6/9/2010 | P | PASS |
Dave Hannah
|
|
|
Darrell Phone #: ###-####
|
BLD-Framing/Rough-in | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | PART |
Dave Hannah
|
|
|
kelly Phone #: ###-#### framing on elec shelding ok to cover
|
BLD-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | DONE |
Forrest France
|
|
|
Regarding pending remodel work for RF sheilding at one room SE corner third floor.
|
BLD-Final | 3/10/2010 | 3/12/2010 | 3/12/2010 | A | PART |
Jim Storey
|
|
|
daryl Phone #: ###-#### temp ok seperate permit to be pulled for ne corner of this project to sey sink and finsh out the room. temp occ. ok 301
|
FIRE-Final Inspection | 3/8/2010 | 3/10/2010 | 3/12/2010 | A | PASS |
Forrest France
|
|
|
Corrections completed, fire life safety final inspection passed. Ceiling at room 319 to remain OTS pending future modifications to be submitted at a later date per contractor.
|
BLD-Other | 2/5/2010 | 2/8/2010 | 2/8/2010 | A | PART |
Dave Hannah
|
|
|
Daryl Phone #: ###-#### ceiling grid ok to cover
|
BLD-Framing/Rough-in | 1/11/2010 | 1/12/2010 | 1/12/2010 | A | PASS |
Dave Hannah
|
|
|
Darrell Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2009 | 11/5/2009 | 11/5/2009 | A | PASS |
Dave Hannah
|
|
|
Darrel Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 10/15/2009 | 10/16/2009 | 10/16/2009 | A | PART |
Dave Hannah
|
|
|
daryl Phone #: ###-#### east 1/3 rd ok to cover
|