BLD-Final | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Tony Young
|
|
|
Walt if possible please make as late as possible please call first Phone #: ###-####
|
DOC - Permit Finaled | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Other | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | PART |
Tony Young
|
|
|
walt Phone #: ###-#### conf on final,, fire caulk, guard rail, address,, trades
|
BLD-Energy code compliance | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | PASS |
Tony Young
|
|
|
Walt-Please call when on your way for inspection Phone #: ###-####
|
BLD-Energy code compliance | 9/15/2009 | 9/16/2009 | 9/16/2009 | A | PASS |
Tony Young
|
|
|
Walt-Please call when on your way for inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2009 | 9/9/2009 | 9/9/2009 | P | PART |
Tony Young
|
|
|
Walt-please call when on your way up the hill Phone #: ###-#### ok to insulate,, verify seal package,, will need egress window by final,, nail 3 ply trusses per specs, brace top chord up stairs by fire place,, need hanger by bedroom door,, insulation for fireblocks at stairs
|
BLD-Conference | 9/2/2009 | 9/3/2009 | 9/3/2009 | P | PART |
Tony Young
|
|
|
Mike Phone #: ###-#### frame ?s
|
BLD-Other | 8/14/2009 | 8/17/2009 | 8/18/2009 | P | PART |
Dave Hannah
|
|
|
shear nail inspection//Mike Phone #: ###-#### ok to cover ext
|
BLD-Foundation | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | PASS |
Dave Hannah
|
|
|
robert - late as possible Phone #: ###-####
|
BLD-Footing | 7/22/2009 | 7/23/2009 | 7/23/2009 | A | PART |
Dave Hannah
|
|
|
Late am please-Robert Phone #: ###-#### ext wall ftgs ok to pour also they are not pouring a basement
|
BLD-Footing | 7/22/2009 | 7/22/2009 | 7/22/2009 | P | NR |
Dave Hannah
|
|
|
Late am please-Robert Phone #: ###-####
|