BLD-Final | 9/11/2009 | 9/14/2009 | 9/14/2009 | A | PASS |
Mike Jordan
|
|
|
gail Phone #: ###-####. ok for perm occ. Checked with Andrea with Zoning. ok.
|
FIRE-Conference | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | DONE |
Troy Cobbley
|
|
|
I posted a "Do Not Occupy" sticker and spoke to the tenant about sign off's still required prior to occupancy. Mike Jordan was also notified of the situation.
|
FIRE-Final Inspection | 9/1/2009 | 9/2/2009 | 9/2/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 9/1/2009 | 9/2/2009 | 9/2/2009 | A | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####. Spoke with Jim noting that he neede a zoning final. Still needs fire as well.
|
FIRE-Final Inspection | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire sprinkler permit needs addressed, provide fire extinguisers per the approved plans and repair the west emergency light.
|
BLD-Framing/Rough-in | 8/26/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Mike Jordan
|
|
|
Jim-ceiling grid inspection please Phone #: ###-####. Ceiling grid ok.
|
BLD-Energy code compliance | 8/14/2009 | 8/17/2009 | 8/17/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. ok to cover demissing wall.
|
BLD-Energy code compliance | 8/13/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Mike Jordan
|
|
|
jim - early afternoon please Phone #: ###-####. Interior walls for offices.
|
BLD-Framing/Rough-in | 8/12/2009 | 8/13/2009 | 8/13/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior steel stud walls only. No grid.
|
BLD-Framing/Rough-in | 8/7/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior steel studs for demissing wall only.
|