Permit Information
Permit NumberBLD09-01151
StatusFinaled
Name VISSER BUILDING CO
Site Address 1108 E LEWIS ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 5731 sq. ft. two story (first story 2344, second story 2144 sq. ft., Unfinished above garage 1248 sq. ft.) with 5 bedrooms, 4 1/2 bathrooms, 1248 sq. ft. attached garage and approximately 600 sq. ft. of covered patio/porch area. All work to be done per the approved plans, plan review report, notations and the attached engineering. R-1CH zoning, DRH09-00107 and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/5/20104/6/20104/6/2010APASS
DetailsDave Hannah
Inspection requested from web by: Robert Hunter Phone #: ###-####
DOC - Permit Finaled4/6/20104/6/20104/6/2010PPASS
DetailsDave Hannah
BLD-Final3/31/20103/31/20103/31/2010PPART
DetailsDave Hannah
Inspection requested from web by: Robert Hunter Phone #: ###-#### c/n on site
BLD-Conference2/2/20102/3/20102/3/2010APASS
DetailsDave Hannah
Bob Phone #: ###-#### talked about stairs on ext side of garage last riser will need to be painted
BLD-Energy code compliance11/12/200911/13/200911/13/2009APASS
DetailsJim Sly
BOB Phone #: ###-####
BLD-Framing/Rough-in11/4/200911/5/200911/5/2009PPASS
DetailsDave Hannah
bob Phone #: ###-#### ok to insulate
BLD-Framing/Rough-in10/7/200910/7/200910/7/2009PPART
DetailsDave Hannah
Bob Phone #: ###-#### shear ok to cover ext
BLD-Footing8/24/20098/24/20098/25/2009PPASS
DetailsDave Hannah
Jay-as early as possible Phone #: ###-####
BLD-Foundation8/20/20098/21/20098/21/2009APASS
DetailsTony Young
Jay Phone #: ###-####
BLD-Footing8/20/20098/21/20098/21/2009APASS
DetailsTony Young
Jay Phone #: ###-####
verified letter of ok from MTI to pour on rubble fill,, wip
BLD-Foundation8/19/20098/19/20098/19/2009PPART
DetailsDave Hannah
jay Phone #: ###-#### basement area
BLD-Foundation8/18/20098/18/20098/18/2009PPART
DetailsDave Hannah
jay -as soon as possible please Phone #: ###-#### garage ok
BLD-Footing8/18/20098/18/20098/18/2009PCANC
DetailsDave Hannah
jay -as soon as possible please Phone #: ###-#### basement or lower area ok
BLD-Footing8/13/20098/14/20098/14/2009APART
DetailsDave Hannah
Jay Phone #: ###-#### ok to pour first section will pour lower area next