Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01165
StatusExpired
Name BOND CAMPBELL
Site Address 1212 N 16TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of a full basement to an existing 2-story single family dwelling. The project will also include the construction of a new detached 576s.f. garage that is engineered for the support of a 367s.f. (usable) space on a 2nd level that is accessed by an exterior code complying stair system. R-1CH ok per DRH09-00039 by Mathew Halitsky. Separate electrical, plumbing, mechanical and ESC permits are required. R-1CH ok per
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired2/3/20122/3/20122/3/2012PPASS
DetailsTony Young
BLD-Aging Inspection2/2/20122/2/20122/3/2012 FAIL
DetailsTony Young
BLD-Aging Inspection9/30/20119/30/201110/6/2011 FAIL
DetailsTony Young
BLD-Aging Inspection4/12/20114/12/20114/13/2011 FAIL
DetailsTony Young
BLD-Aging Inspection2/10/20112/10/20112/15/2011 PEND
DetailsTony Young
BLD-Aging Inspection11/29/201011/29/201012/6/2010 PEND
DetailsTony Young
BLD-Final9/27/20109/28/20109/28/2010APART
DetailsTony Young
Bond ###-####,, house ok
BLD-Framing/Rough-in9/7/20109/7/20109/7/2010PPART
DetailsTony Young
bond Phone #: ###-####,, frame looks ok,, walk through only,, need trades 1st
BLD-Final8/5/20108/6/20108/17/2010APEND
DetailsTony Young
bond Phone #: ###-####,, house only,, garage not ready
BLD-Final8/4/20108/4/20108/6/2010PPART
DetailsTony Young
bond Phone #: ###-####,, house only,, garage not ready,, inside house ok,,
BLD-Conference8/3/20108/4/20108/5/2010APART
DetailsTony Young
bond Phone #: ###-####,, ?s on final
BLD-Final8/4/20108/5/20108/5/2010ANR
DetailsTony Young
bond Phone #: ###-####,, house only,, garage not ready,, walk through house,, need tread on top of basement stairs to meet code w/in 3/8",, need ladders in window wells in basement,, will need zoning final also
BLD-Final8/2/20108/3/20108/4/2010ANR
DetailsTony Young
bond Phone #: ###-####,, need zoning 1st
BLD-Footing7/28/20107/28/20107/28/2010PPART
DetailsTony Young
Footing for the garage only please-Bond Phone #: ###-####,, work in progress
BLD-Energy code compliance3/16/20103/17/20103/17/2010APASS
DetailsTony Young
bond Phone #: ###-####
BLD-Framing/Rough-in3/15/20103/16/20103/16/2010PPASS
DetailsTony Young
bond Phone #: ###-####
BLD-Framing/Rough-in3/9/20103/9/20103/9/2010PPART
DetailsTony Young
Bond Phone #: ###-####,, need egress out of upper bedroom,, ok to insulate,, verify fireblocks at ceiling line,,
BLD-Other3/3/20103/3/20103/4/2010PPASS
DetailsTony Young
bond - sheeting/nailing Phone #: ###-####,, exterior ok
BLD-Conference1/6/20101/6/20101/7/2010PPART
DetailsDave Hannah
Bond Campbell--Please call at least 30 mins prior to inspection Phone #: ###-#### ok to spray ceiling with upstairs with 3ins of closed ceil insulation also ok to spray rims headers are in rims and are ok
BLD-Foundation10/6/200910/7/200910/7/2009PPART
DetailsTony Young
bond Phone #: ###-####
ok pending special inspection,, ARXX foam block walls
BLD-Footing9/28/20099/28/20099/28/2009PPART
DetailsTony Young
lance Phone #: ###-####
second part of basement ftg ok,, window well ftgs,, front porch,, all wip
BLD-Footing9/4/20099/8/20099/9/2009PPART
DetailsDave Hannah
Bond Phone #: ###-#### first section of basement footings ok to pour