BLD-Final | 12/10/2009 | 12/10/2009 | 12/10/2009 | P | PASS |
Dave Hannah
|
|
|
###-####-Please call prior to going up to the 3rd floor of city hall 2 Keith
|
DOC - Permit Finaled | 12/10/2009 | 12/10/2009 | 12/10/2009 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 12/7/2009 | 12/8/2009 | 12/8/2009 | A | PASS |
Forrest France
|
|
|
Final fire life safety inspection passed, scope of work is complete.
|
BLD-Final | 8/5/2009 | 8/5/2009 | 8/7/2009 | P | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-#### ok for perm occ
|
BLD-Final | 8/4/2009 | 8/5/2009 | 8/5/2009 | A | CANC |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
FIRE-Final Inspection | 8/4/2009 | 8/4/2009 | 8/4/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety passed, door at the new legal office to be installed prior to structural final.
|
FIRE-Final Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | PART |
Forrest France
|
|
|
Fire life safety inspection completed for the new legal office area, work to date is acceptable, door to the new office is not yet installed, discussed items needed for permit final at remodel locations.
|
BLD-Framing/Rough-in | 7/22/2009 | 7/23/2009 | 7/23/2009 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####. Ok for cover.
|