Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD09-01208
StatusFinaled
Name TRESIDIO HOMES
Site Address 2750 S KYLEE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2,022 square foot new single family dwelling on an existing foundation (poured in October 2008 under permit BLD08-02074) with a 671 square foot attached garage, a 200 square foot covered front porch, and a 120 square foot covered rear patio. "THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." All work per the approved plans, plan review redlines and attached report. R-1B zoning and building setbacks per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/12/200911/13/200911/13/2009APASS
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Jon Hastings
DOC - Permit Finaled11/13/200911/13/200911/13/2009PPASS
DetailsMike Jordan
Cert. of occ was issued. Insul. cert. has been posted.
BLD-Final10/26/200910/26/200910/26/2009PFAIL
DetailsMike Jordan
Final Inspection Needed Phone #: ###-#### Internet Inspection Request from: Jon Hastings. Needs to provide insulation cert.
BLD-Conference8/25/20098/25/20098/26/2009PCANC
DetailsMike Jordan
I''d like to confirm if this inspection request goes through - yesterday it didn''t. Please feel free to call Andy at ###-#### to confirm that the scheduling went through. Russ (Project Manager) will meet you at the job site - his number is ###-#### Phone #: ###-#### Internet Inspection Request from: Jon Hastings
BLD-Energy code compliance8/26/20098/26/20098/26/2009PPASS
DetailsMike Jordan
I''d like to confirm if this inspection request goes through - yesterday it didn''t. Please feel free to call Andy at ###-#### to confirm that the scheduling went through. Russ (Project Manager) will meet you at the job site - his number is ###-#### Phone #: ###-#### Internet Inspection Request from: Jon Hastings
BLD-Framing/Rough-in8/26/20098/26/20098/26/2009PPASS
DetailsMike Jordan
I''d like to confirm if this inspection request goes through - yesterday it didn''t. Please feel free to call Andy at ###-#### to confirm that the scheduling went through. Russ (Project Manager) will meet you at the job site - his number is ###-#### Phone #: ###-#### Internet Inspection Request from: Jon Hastings
BLD-Framing/Rough-in8/21/20098/21/20098/21/2009PFAIL
DetailsMike Jordan
We met with Franklin Building and are ready for you this afternoon. Phone #: ###-#### Internet Inspection Request from: Jon Hastings. Complete lateral bracing on a5 and a6 trusses. Provide tempered glazing at window by backdoor. ok to insul. c/n posted.
BLD-Framing/Rough-in8/20/20098/21/20098/21/2009AFAIL
DetailsMike Jordan
Please call so we can plan to meet you out there. Thanks Phone #: ###-#### Internet Inspection Request from: Jon Hastings. Incomplete set of truss enginnering.
BLD-Conference7/31/20097/31/20097/31/2009PDONE
DetailsMike Jordan
Spoke on the phone with Mike Jordan who said that he could meet around 10am for a Conference. Phone #: ###-#### Internet Inspection Request from: Jon Hastings