BLD-Aging Inspection | 11/5/2010 | 11/5/2010 | 11/9/2010 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/9/2010 | 11/9/2010 | 11/9/2010 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | PASS |
Mike Jordan
|
|
|
Mick Phone #: ###-####. Lock indicator installed, door hardware at ada restrooms changed. ok for perm occ.
|
BLD-Final | 10/8/2009 | 10/9/2009 | 10/9/2009 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-####-Mick. Will reschedule for Monday.
|
BLD-Final | 10/7/2009 | 10/8/2009 | 10/8/2009 | P | FAIL |
Mike Jordan
|
|
|
Mick-late am please Phone #: ###-####. Needs to provide lock indicator at main door, and door hardware on restroom not ada compliant.
|
FIRE-Final Inspection | 10/7/2009 | 10/7/2009 | 10/7/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Framing/Rough-in | 9/23/2009 | 9/24/2009 | 9/24/2009 | A | PASS |
Mike Jordan
|
|
|
Mick-Ceiling grid inspection please Phone #: ###-####. Ceiling grid is now ok to cover.
|
BLD-Other | 9/21/2009 | 9/22/2009 | 9/22/2009 | A | PART |
Mike Jordan
|
|
|
mick - around 9 if possible - grid Phone #: ###-####. Needs to pull mech permit and get mech and sprinkler ri insp.Also needs to add wires to all diffusers. No tile at this time.
|
BLD-Framing/Rough-in | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | NR |
Mike Jordan
|
|
|
mick Phone #: ###-####. Needs other trades to complete work and get ri insp. prior to grid insp.
|
BLD-Framing/Rough-in | 8/21/2009 | 8/21/2009 | 8/21/2009 | P | PASS |
Mike Jordan
|
|
|
mick - first thing this afternoon if possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | CANC |
Mike Jordan
|
|
|
Mick Phone #: ###-####
|
BLD-Conference | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | DONE |
Mike Jordan
|
|
|
Mick Phone #: ###-####
|