Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD09-01277
StatusFinaled
Name KNOTHE MITCHEL A
Site Address 1106 N 21ST ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the remodel of an existing 2642s.f. single family dwelling that is to include interior partition work to convert 2-bedrooms into an master suite; create a new covered front porch area by moving the exterior wall back even with the entry/closet areawalls. ; reside and replace the windows. There will also be a new 0 clearance direct vent fireplace installed on the south wall of the living room. R-1CH ok per DRH09-00132 by Mathew Halitscky. All per the approved plans as marked and the plan review notes from BLD08-01209. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/28/201110/31/201110/31/2011APASS
DetailsDave Hannah
mitch Phone #: ###-####
BLD-Final10/28/201110/28/201110/28/2011PPASS
DetailsDave Hannah
DOC - Permit Finaled10/28/201110/28/201110/28/2011PPASS
DetailsDave Hannah
BLD-Final10/14/201110/17/201110/18/2011PPART
DetailsDave Hannah
MITCHEL Phone #: ###-#### everything is ok needs zoning signoff
DOC - Permit Expired12/8/201012/8/201012/8/2010APASS
DetailsDave Hannah
BLD-Aging Inspection12/8/201012/8/201012/8/2010 FAIL
DetailsDave Hannah
BLD-Aging Inspection10/8/201010/8/201010/11/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection4/14/20104/14/20104/21/2010 PASS
DetailsDave Hannah
contractor hopes to have it done some time in the next 30 days
BLD-Aging Inspection2/11/20102/11/20102/12/2010 PASS
DetailsDave Hannah
work in progress
BLD-Energy code compliance9/4/20099/4/20099/4/2009PPASS
DetailsDave Hannah
Mitch Phone #: ###-#### ok to cover
BLD-Framing/Rough-in9/3/20099/4/20099/4/2009APASS
DetailsDave Hannah
Mitch Phone #: ###-#### seal package ok ok to insulate
BLD-Framing/Rough-in9/3/20099/3/20099/4/2009PPASS
DetailsDave Hannah
Mitch Phone #: ###-#### late as possible ok to insulate after elec r/i is approved