BLD-Final | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Mike Jordan
|
|
|
Inspection requested from web by: Mike Walling Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 2/5/2010 | 2/8/2010 | 2/8/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 | P | FAIL |
Troy Cobbley
|
|
|
The life safety will be ok to pass when the project related fire alarm and sprinkler permits are finaled. The gate to the parking lot has not been installed yet but there is atleast 20' of clearance and the key for the lock on the gate is going to be provided in the knox box.
|
BLD-Conference | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | PASS |
Mike Jordan
|
|
|
Went over ADA features.
|
BLD-Conference | 1/18/2010 | 1/19/2010 | 1/19/2010 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Walling
|
BLD-Energy code compliance | 11/10/2009 | 11/12/2009 | 11/12/2009 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Walling
|
BLD-Framing/Rough-in | 10/20/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Interior steel stud framed walls, and hardlids for restrooms, offices and demissing wall.
|
BLD-Energy code compliance | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/30/2009 at 1:28:30 PM. Contact: ###-####. Front showroom area only.
|