BLD-Final | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Issues with 1hr. room were repaired as shown on approved plans. ok for perm occ.
|
BLD-Final | 9/29/2009 | 9/30/2009 | 9/30/2009 | A | FAIL |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Cannot verify attachment for 1hr. wall or membrane protection at lights for 1hr. wall. c/n posted.
|
FIRE-Final Inspection | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed. Matt is to provide the missing sticker at the main exit. The oxygen is not on site for quantity verification. I also notified matt that the area over the offices can not be used for storage without plan review approval.
|
FIRE-Final Inspection | 9/25/2009 | 9/25/2009 | 9/25/2009 | P | FAIL |
Troy Cobbley
|
|
|
There was no access to the tenant to perform the inspection. I left a message on Matt's phone.
|
BLD-Framing/Rough-in | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PART |
Mike Jordan
|
|
|
matt Phone #: ###-####. attacment of 5/8 type x rock to back side of 1hr room. ok.
|
BLD-Framing/Rough-in | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | FAIL |
Mike Jordan
|
|
|
matt Phone #: ###-####. Needs to ressubmit plan to plan reveiw showing additional work that was added. Also needs to attach 5/8 type x rock to steel studs as shown on approved plan for the 1hr wall assembly.
|