BLD-Final | 9/15/2009 | 9/16/2009 | 9/16/2009 | A | DONE |
Dave Hannah
|
|
|
Craig-please call at least 15 mins prior to inspection so he can meet ya there Phone #: ###-####
|
BLD-Final | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Dave Hannah
|
|
|
Craig Phone #: ###-#### //please call 30 min prior to meet, wants ok for perm occ
|
FIRE-Final Inspection | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Forrest France
|
|
|
Door hardware corrections satisfactory. Sprinkler corrections will be completed under a seperate FIR permit.
|
BLD-Final | 8/20/2009 | 8/21/2009 | 8/21/2009 | P | CANC |
Tony Young
|
|
|
Buddy PLEASE CALL FIRST BEFORE GOING OUT Phone #: ###-####
|
FIRE-Final Inspection | 8/20/2009 | 8/21/2009 | 8/21/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware for the main exit door (remove thumbturn lock) and provide sticker as discussed. Provide corrected sprinkler coverage as discussed. This work will require permits.
|