BLD-Final | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Mike Jordan
|
|
|
kent Phone #: ###-####
|
DOC - Permit Finaled | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of occupancy was issued.
|
BLD-Aging Inspection | 5/24/2010 | 5/24/2010 | 5/24/2010 | | PASS |
Mike Jordan
|
|
|
Drove by project, work is still in progress.
|
BLD-Other | 3/23/2010 | 3/24/2010 | 3/24/2010 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-####. Spoke with homeowner regarding no energy code inspection. Homeowner mentioned that Marvs insulation did the work and that they were to have scheduled an inspection, but apparently never did. Noted that interior finish has been installed. Also noted that Homeowner had an energystar inspector inspect the insulation prior to cover. Noted to homeowner to get a letter from energy star inspector stating that the in place work met the rescheck requirements on approved plans. this would be accepted in leiu of the missed enrgy code inspection.
|
BLD-Aging Inspection | 3/16/2010 | 3/16/2010 | 3/24/2010 | | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 1/13/2010 | 1/13/2010 | 1/13/2010 | P | PASS |
Mike Jordan
|
|
|
Kent Phone #: ###-####. All framing issues have been resolved. ok to insul.
|
BLD-Framing/Rough-in | 1/4/2010 | 1/5/2010 | 1/5/2010 | A | FAIL |
Mike Jordan
|
|
|
Kent Phone #: ###-####. MIn 3 8d nails for all jack truss connections, Provide tempered glass at 3 windows in courtyard, egress window in upstairs bedroom exceeds the max 44" sill height, Provide continous bearing for T9 girder truss or justify current bearing location. c/n posted. ok to insul.
|
BLD-Framing/Rough-in | 12/30/2009 | 12/31/2009 | 12/31/2009 | P | NR |
Dave Hannah
|
|
|
Kent-Please call at least 30 mins prior to inspection Phone #: ###-#### still needs seal package called kent he will get this done and reschedule framing rough in
|
BLD-Framing/Rough-in | 12/30/2009 | 12/30/2009 | 12/30/2009 | P | FAIL |
Mike Jordan
|
|
|
Kent Phone #: ###-####. Needs to complete airseal package prior to framing inspection. Also needs to provide city set of approved plans and truss engineering. c/n was issued.
|
BLD-Conference | 10/22/2009 | 10/22/2009 | 10/22/2009 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | DONE |
Mike Jordan
|
|
|
JOSHUA - as soon as possible Phone #: ###-####
|
BLD-Foundation | 9/21/2009 | 9/22/2009 | 9/22/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/21/2009 at 7:48:05 AM. Contact: ###-####.WIP.
|
BLD-Footing | 9/21/2009 | 9/21/2009 | 9/21/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/21/2009 at 7:47:41 AM. Contact: ###-####.
|