BLD-Final | 11/2/2010 | 11/3/2010 | 11/3/2010 | A | PASS |
Jim Sly
|
|
|
Zack ###-#### OK for Perm Occ.
|
BLD-Final | 10/25/2010 | 10/27/2010 | 10/26/2010 | P | NR |
Jim Sly
|
|
|
zack Phone #: ###-#### Need ACHD and Electr final.
|
FIRE-Final Inspection | 10/22/2010 | 10/25/2010 | 10/25/2010 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Energy code compliance | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Jim Sly
|
|
|
zack Phone #: ###-####
|
BLD-Foundation | 3/25/2010 | 3/26/2010 | 3/26/2010 | P | PART |
Jim Sly
|
|
|
mike - pouring at 3 Phone #: ###-#### OK pending special inspection....MTI inspections, tests and approvals.
|
BLD-Foundation | 3/23/2010 | 3/24/2010 | 3/24/2010 | P | PART |
Jim Sly
|
|
|
tim - pouring at 1:00 Phone #: ###-#### 80% complete. WIP on reinforcing. Special inspection required 3500 psi MTI planned inspection. Footings only.
|
BLD-Final | 2/17/2010 | 2/18/2010 | 2/18/2010 | A | CANC |
Jim Sly
|
|
|
Called Wright Bros.....Still getting bids to start project.
|