BLD-Final | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | PASS |
Mike Jordan
|
|
|
Ruston Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ. issued.
|
BLD-Energy code compliance | 11/13/2009 | 11/13/2009 | 11/13/2009 | P | PASS |
Mike Jordan
|
|
|
Rustin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Mike Jordan
|
|
|
Rustin Phone #: ###-####. ok to insulate.
|
BLD-Other | 10/16/2009 | 10/19/2009 | 10/19/2009 | A | PASS |
Mike Jordan
|
|
|
stem wall insp//Rustin Phone #: ###-####
|
BLD-Foundation | 10/12/2009 | 10/12/2009 | 10/12/2009 | P | FAIL |
Mike Jordan
|
|
|
Ben Phone #: ###-####. ESC issues were not resolved from last inspection. A stop work has been placed until ESC site prep. inspection has passed. Ok to schedule esc inspections only.
|
BLD-Footing | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/8/2009 at 4:32:28 PM. Contact: ###-####. wip. Noted to contractor that excavation may not be deep enough. Concrete contractor shot elevation. Contractor will be able to get enough fill to get the nfrost depth. This may cause drainage issues with neighbors. Noted to contractor that after const is complete and the city gets any compliants due to excessive water in neighbors yards, that they will be required to fix any issues.
|