Permit Information
Permit NumberBLD09-01723
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReviewNo
Description
(ST LUKES)(3RD & 4TH FLR)(3C-ENDOVASCULAR OR TI) Tenant improvement includes selective demolition and remodel of portion of the third floor, North Wing, Endovascular O.R and clean supply room, approximately 1,460 sq. ft. An existing electrical supply penthouse located at the Central Wing fourth floor is to be removed to allow space for a new Roof Top Air-Handling Unit and associated roof improvements. Scope of work includes expansion of Endovascular O.R. into the existing Clean Supply room and add a Control Room for the O.R.; install lead-lined gypsum wall board to a height of 7' a.f.f. with lead lined window at O.R. & Control Room; relocate lead lined entry door / hardware / view panel to O.R; complete interior finishes, millwork, electrical, mechanical, plumbing, sprinkler and alarm modifications. Connect new equipment per structural details of plans & add W12x26 steel beams to support new RTU equipment. Provide Special Inspection per ESR 1917, Hilti KWIK BOLT TZ & ESR 2262, Hilti HIT-HY 150 MAX Adhesive Anchors for concrete, copies attached to plans. drs 8-31-10 FINAL CERT OF VALUE PER GC $ 1,145,835.00 ///DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/16/20108/17/20108/17/2010PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
DOC - Permit Finaled8/17/20108/17/20108/17/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection8/16/20108/17/20108/17/2010APASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Aging Inspection8/16/20108/16/20108/17/2010 PASS
DetailsDave Hannah
BLD-Other6/11/20106/14/20106/15/2010APASS
DetailsDave Hannah
zack - wall cover Phone #: ###-#### ok to cover ceiling
BLD-Wall cover6/7/20106/11/20106/11/2010ACANC
DetailsDave Hannah
zack Phone #: ###-####
FIRE-Final Inspection4/30/20104/30/20105/3/2010PNR
DetailsForrest France
FIRE-Final Inspection4/21/20104/22/20104/22/2010ANR
DetailsForrest France
Project related fire alarm and sprinkler permits must be finaled prior to fire life safety approvals. Discussed FA work in progress, FP rough-in passed- finals pending.
BLD-Framing/Rough-in4/15/20104/16/20104/16/2010APART
DetailsDave Hannah
Zack or ###-#### Kelly- Cover Inspection Phone #: ###-#### ceiling grid in mec room ok to cover
BLD-Framing/Rough-in4/7/20104/7/20104/8/2010PPART
DetailsDave Hannah
kelly Phone #: ###-#### wall kelly has covered most of the wall all ready I can see the framing at the tops mti has signed off bolting into ceiling for equp.
BLD-Aging Inspection2/1/20102/1/20102/1/2010 PASS
DetailsDave Hannah