Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD09-01820
StatusFinaled
Name ESI
Site Address 7031 S EISENMAN RD
Project NamePower Bar
Customer Number 
ePlanReviewNo
Description
(Power Bar) Permit for the remodel of 8,389 sq.ft. area within an existing 187,820 tenant space, expanding the production area which includes the removal of some office area. infill of some existing doors, new suspended ceiling and lighting in the production area and the construction of a green room. All work to be done per the approved plans. Any racking over 8 feet in height requires a separate racking permit. This is a fully sprinkled building; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by Boise City Fire Department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20108/3/20108/3/2010APASS
DetailsJim Storey
jerry ###-####
DOC - Permit Finaled8/3/20108/3/20108/3/2010PPASS
DetailsJim Storey
FIRE-Final Inspection7/29/20107/30/20107/30/2010APASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection7/13/20107/13/20107/16/2010 DEFR
DetailsJim Storey
Mike Phone #: ###-#### need fire life saftey sign off.
BLD-Final5/12/20105/13/20105/13/2010AFAIL
DetailsJim Storey
Mike Phone #: ###-#### need fire life saftey sign off.
BLD-Aging Inspection5/3/20105/3/20105/3/2010 DEFR
DetailsJim Storey
pending fire
FIRE-Conference3/1/20103/1/20103/2/2010ADONE
DetailsForrest France
Regarding on site conference notes completed 2/26; On site visit with responding fire department station 12 crew and Captain Bill Ream regarding insufficient access to the existing FDC due to adjacent building service equipment and surrounding fenced enclosure. Fire department connections must be in compliance with IFC 2006 sec. 912.1, 912.2, 912.3 for installation, location and access. Fire Sprinkler contractor to provide plan modification documents indicating proposed new FDC location in accordance with the applicable standards prior to site inspection for approval. Power Bar representatives Michael Fanelle and Michelle McMullen included in the discussion on premise. Permit finals pending.
FIRE-Sprinkler Rough-in1/15/20101/15/20101/15/2010APART
DetailsForrest France
Fire sprinkler rough-in okayed for cover at the drop ceilings in the remodel area.
BLD-Framing/Rough-in12/9/200912/9/200912/9/2009PPART
DetailsJim Storey
Brian-Ceiling grid inspection please Phone #: ###-#### ceilling ok pending instaltion and aproval from ele and fire spk.
BLD-Framing/Rough-in11/24/200911/30/200911/30/2009APASS
DetailsJim Storey
Antonio Phone #: ###-#### warehouse/production walls ok to cover.
BLD-Framing/Rough-in11/17/200911/18/200911/18/2009APASS
DetailsJim Storey
Brian Phone #: ###-#### east rm ok to cover.