Description
(Century 21) ***PLAN MODIFICATION 715 SQ. FT. IN THE BACK OF THE SPACE WILL BE USED AS A CLASSROOM, INCREASING THE OCCUPANt LOAD BY 31 EXISTING EXITING AND FIXTURE COUNT IS SUFFICIENT*** Suite 185 Permit for minor tenant improvements to an existing tenant space with work to include the removal of approximately 25 lineal feet of interior non-bearing partition wall, construction of approximately 80 lineal feet of interior non-bearing partition wall, installation of a new drinking fountain, vertical grab bars, dishwasher and related interior finishes. all work to be done per the approved plans,and any notations. CDM 2-24-10 FINAL CERT OF VALUE PER GC $ 577.00///DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/21/200912/22/200912/22/2009APASS
DetailsMike Jordan
Mike,

Please call me when you are on your way. Troy has signed me off and you are all that is left. Thanks,

Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns. Ok for perm occ.
FIRE-Final Inspection12/17/200912/18/200912/18/2009APASS
DetailsTroy Cobbley
life safety passed.
BLD-Final11/24/200911/25/200911/25/2009APART
DetailsMike Jordan
Mike,

Can you give me a call when you are headed towards the job. I am not on site and need to meet you there to let you in.

Thanks,

Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns. Needs to resubmit plans to plan review showing correct layout and occ. type at training room or classroom. Noted total of 36 seats. Ok to give temp occ. per Bob Archibald.
FIRE-Final Inspection11/19/200911/20/200911/20/2009APART
DetailsTroy Cobbley
A temporary occupancy is given with mark sentenos permission until the single action hardware is installed on the north exit door and the two overspaced sprinkler pendants.
FIRE-Final Inspection11/19/200911/19/200911/19/2009PNR
DetailsForrest France
Project is not ready for inspection at this time per conversation with contractor, rescheduled as discussed.
BLD-Framing/Rough-in11/3/200911/4/200911/4/2009APART
DetailsMike Jordan
Todd Phone #: ###-####. pend. elec. inspection.