BLD-Final | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | PASS |
Mike Jordan
|
|
|
steve Phone #: ###-####
|
DOC - Permit Finaled | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of occupancy issued.
|
BLD-Final | 4/30/2010 | 5/3/2010 | 5/3/2010 | A | NR |
Jim Sly
|
|
|
steve Phone #: ###-####
|
BLD-Energy code compliance | 1/4/2010 | 1/4/2010 | 1/4/2010 | P | PASS |
Tom Arcoraci
|
|
|
As Late as possible please-Steve Baker Phone #: ###-####
|
BLD-Framing/Rough-in | 12/30/2009 | 12/31/2009 | 12/31/2009 | P | PASS |
Tom Arcoraci
|
|
|
Steve Phone #: ###-#### ok to insul after mech insp
|
BLD-Foundation | 12/1/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Jim Sly
|
|
|
Steve ###-####//pouring at 2
|
BLD-Footing | 12/1/2009 | 12/2/2009 | 12/2/2009 | P | PASS |
Jim Sly
|
|
|
Steve Baker ###-####//pouring at 2
|