BLD-Final | 5/11/2010 | 5/12/2010 | 5/12/2010 | A | PASS |
Mike Jordan
|
|
|
Alan Phone #: ###-####
|
DOC - Permit Finaled | 5/12/2010 | 5/12/2010 | 5/12/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of occupancy has been issued.
|
BLD-Energy code compliance | 3/18/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Mike Jordan
|
|
|
alan Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Mike Jordan
|
|
|
alan Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2010 | 3/17/2010 | 3/17/2010 | A | FAIL |
Mike Jordan
|
|
|
Alan Phone #: ###-####. Needs to provide engineering for open web joist and draft stop at open web joist. c/n posted. ok to insulate.
|
BLD-Footing | 2/11/2010 | 2/12/2010 | 2/12/2010 | A | PASS |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Footings for balcony ok.
|
BLD-Footing | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | FAIL |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Footings need to be dug down to frost depth.
|
BLD-Foundation | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | FAIL |
Mike Jordan
|
|
|
todd Phone #: ###-####. No approved palns on site to perform inspection. Contacted todd at number above. Will reschedule for this afternoon.
|
BLD-Foundation | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 1/22/2010 | 1/25/2010 | 1/25/2010 | A | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####. ESC issues not resolved. No conc. is to be allowed to be placed. Has been rescheduled for pm after ESC issues have been resolved.
|
BLD-Footing | 1/22/2010 | 1/22/2010 | 1/22/2010 | P | PASS |
Dave Hannah
|
|
|
dane Phone #: ###-####
|