Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD10-00115
StatusFinaled
Name HCD INC
Site Address 5208 W IRVING ST
Project NameGREAT BASIN BEVERAGE
Customer Number 
ePlanReviewNo
Description
(GREAT BASIN BEVERAGE) This building is fully fire sprinklered for area increase. To remodel an existing 16,374 square foot building to be used as a beverage sales office and warehouse. Work is to include an interior wall, a new exterior entrance door, a new exterior overhead door, and finishes. Interior non-structural demolition is also covered under this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. A separate permit is required for high-piled stock or rack storage. Racks shall be designed, in compliance with the 2006 IBC, to resist gravity and seismic loads. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection4/27/20104/27/20104/27/2010PPASS
DetailsForrest France
C/N items finished, fire life safety finaled.
BLD-Final4/27/20104/27/20104/27/2010PPASS
DetailsTom Arcoraci
junior Phone #: ###-####
FIRE-Final Inspection4/23/20104/26/20104/26/2010PFAIL
DetailsForrest France
Missing signage at the main entry/exit door, several fire extinguishers are overdue certification and need to be posted.
BLD-Final4/23/20104/26/20104/26/2010PNR
DetailsTom Arcoraci
dennis Phone #: ###-####
BLD-Final4/22/20104/23/20104/23/2010PCANC
DetailsTom Arcoraci
dennis Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
FIRE-Final Inspection4/22/20104/23/20104/23/2010AFAIL
DetailsTroy Cobbley
Several of the items noted by the plan reviewer to be addressed have not been performed yet so the inspection was going to be re-scheduled for next week. A full inspection was not performed. Also the project related fire sprinkler permit needs to be finaled as well.
FIRE-Final Inspection4/22/20104/22/20104/23/2010ACANC
DetailsTroy Cobbley
Canceled due to time constraints and micron plan review
BLD-Framing/Rough-in3/30/20103/30/20103/30/2010PPASS
DetailsTom Arcoraci
gene Phone #: ###-####