Permit Information
Permit NumberBLD10-00123
StatusFinaled
Name CM COMPANY
Site Address 1010 W WASHINGTON ST
Project NameBOISE HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BOISE HIGH SCHOOL)(AUDITORIUM SEISMIC UPGRADE) 6/18/10 PLAN MODIFICATION. TO EXPAND SCOPE OF WORK BY REMOVING EXISTING MAIN ENTRY CONCRETE STAIRS & RAILS ON THE WASHINGTONN STREET SIDE; REMOVE APPROXIMATELY 3" OF LANDING AND FIRST STEP FOR NEW WATERSEAL & CONCRETE OVERLAY TO TIE INTO NEW STAIRWAY. INSTALL STRUCTURAL STEEL CHANNELS, ANGLES AND DECKING TO SUPPORT NEW REINFORCED CONCRETE STAIRS PER SUBMITTED PLANS AND ENGINEERING. SPECIAL INSPECTION REQUIRED FOR ANHESIVE AND MECHANICAL ANCHORS PER MANUFACTURE'S ESR REPORT. REINSTALLED HANDRAILS TO COMPLY WITH CURRENT CODE. DRS Remodel to seismically strengthen the auditorium building per approved plans and structural engineering design. Work to include select interior demolition at ceiling and floor at three floors and roof structure serving and a part of the auditorium, balcony seating area; to remove exterior exit stairs on both sides that served the balcony seating and create an exit corridor to serve the third floor balcony area to access existing interior 3rd floor exit stairway systems. Add steel columns, beams, cross-bracing at roof, adhesive anchors and through bolts, steel straps, wood blocking and specific nailing at perimeter floor repair to facilitate seismic strengthening of the auditorium area in accordance with structural engineer evaluation design of upgrades using the 1994 UCBC Appendix Chapter 1 as the design guide for this historic structure. All mechanical fasteners shall be installed per the manufacture's instructions and structural engineers directions. Special inspection is required for epoxy & mechanical anchors per specified ICC Evaluation Services Reports, manufacture's installation instructions, structural engineers specifications; welding; high strength bolts; to repair portions of ceilings and floor sheathing removed for upgrade and miscellaneous finishes per the reviewed plans. Any modifications of fire sprinkler or alarm systems require separate applications, plans and permits as regulated by fire department before work can be done. Electrical, plumbing & mechanical work requires separate trade permits attached to this building permit. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/25/201010/25/201010/27/2010 PASS
DetailsTony Young
DOC - Permit Finaled10/27/201010/27/201010/27/2010PPASS
DetailsTony Young
done
BLD-Final8/23/20108/24/20108/24/2010APASS
DetailsTony Young
craig Phone #: ###-####,, final ok
FIRE-Conference8/23/20108/23/20108/23/2010ADONE
DetailsForrest France
Regarding south exit stairway completion date.
BLD-Conference8/19/20108/20/20108/20/2010APART
DetailsTony Young
Craig-PLease call at least 30 mins prior to inspection Phone #: ###-####,, conf on stairs,, need to put sealer on but will remain open for emergency egress
FIRE-Final Inspection8/12/20108/19/20108/19/2010PPASS
DetailsForrest France
Fire life safety final approved.
FIRE-Conference8/18/20108/18/20108/18/2010ADONE
DetailsForrest France
Regarding inspection schedule.
BLD-Foundation8/12/20108/13/20108/13/2010APART
DetailsTony Young
pending special inspection report,, stairs
BLD-Conference8/11/20108/12/20108/12/2010APART
DetailsTony Young
Craig Phone #: ###-####,, stairs ok pending special inspection report
BLD-Conference8/6/20108/9/20108/9/2010APART
DetailsTony Young
Craig-Please call in advance of inspection Phone #: ###-####,, work in progress on front stairs to entry,, conf or rear fire exit stairs,, these have been modified to make room for new steel pillars for seismic upgrade,, bottom rise will need to meet with in 3/8",, also openings in between risers are more than 4",, need to fix or justify..
BLD-Footing7/21/20107/21/20107/21/2010PPART
DetailsTony Young
craig Phone #: ###-####,, pending special inspection report
BLD-Footing7/14/20107/15/20107/15/2010APART
DetailsTony Young
craig Phone #: ###-####,, pending special inspection report
BLD-Footing7/13/20107/14/20107/14/2010ACANC
DetailsTony Young
Craig Phone #: ###-#### Graig Stevens called to cancel this inspection///dld
BLD-Framing/Rough-in7/9/20107/12/20107/12/2010APASS
DetailsDave Hannah
craig Phone #: ###-#### 3rd floor corr/ exit way
BLD-Conference6/28/20106/29/20106/29/2010APART
DetailsTony Young
Structure inspection-Craig ###-####,, seismic ties ok per noted on plans,, bolt testing pending special inspection results, reports..
BLD-Framing/Rough-in6/18/20106/21/20106/21/2010PPART
DetailsTony Young
Craig Phone #: ###-####,, verified several seismic ties,, noted on plans,, all pending special inspection reports
BLD-Conference6/14/20106/14/20106/14/2010PPART
DetailsTony Young
Craig Phone #: ###-####,, special inspections being performed