BLD-Final | 2/23/2010 | 2/24/2010 | 2/24/2010 | A | PASS |
Jim Sly
|
|
|
Martin-Please call at least 20 mins prior to inspection Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 2/22/2010 | 2/23/2010 | 2/23/2010 | P | PASS |
Forrest France
|
|
|
Items on correction notice completed satisfactory with the exception of panic hardware at the north exit in progress of installation at the time of inspection, one EM light repaired while on site. Single action hardware to be finished for prior to structrual final inspection as agreed.
|
FIRE-Final Inspection | 2/16/2010 | 2/17/2010 | 2/17/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware for the double exit doors out the north side of the building. This is due to the west exit doors already having keyed hardware with the sticker and indicator. Provide one additional emergency light in the new open office area and the adjacent corridor just to the south. Also all of the exit signs need repaired.
|
BLD-Framing/Rough-in | 2/4/2010 | 2/4/2010 | 2/5/2010 | P | PASS |
Jim Sly
|
|
|
Martin Phone #: ###-####
|