BLD-Final | 2/25/2010 | 2/26/2010 | 2/26/2010 | P | PASS |
Jim Sly
|
|
|
call 15 min before//Laurie ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 2/25/2010 | 2/26/2010 | 2/26/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | CANC |
Jim Sly
|
|
|
please call 30 min prior to meet you//Lori ###-#### Fire did not pass......
|
FIRE-Final Inspection | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide singel action hardware on the rear exit door such as lever action or panic. Thumbturn locks are not allowed. Also the existing fire sprinkler system requires modifications to meet code requirements. This work requires a separate permit by a licensed fire sprinkler contractor.
|
FIRE-Hydro test above ground | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type set up.
|
FIRE-Final Inspection | 2/8/2010 | 2/9/2010 | 2/10/2010 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints but I spok to Lori at ###-#### on the phone and discussed getting the existing fire extinguisher tagged and providing the missing sticker over the main door. Inspection has been rescheduled for wednesday.
|
BLD-Final | 2/8/2010 | 2/9/2010 | 2/9/2010 | P | NR |
Dave Hannah
|
|
|
please call 30 min prior to meet you//Lori ###-#### needs fire final inspection triy had to canc today
|