Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-00178
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 655 S BLUE PINE LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1,533 sq. ft., two story (first story 761 sq. ft., second story 772 sq. ft.) Townhouse with 3 bedrooms, 2 1/2 bathrooms and a 531 sq. ft. attached garage. All work to be done per the approved plans, plan review report and any notations. R-2D zoning, DRH08-00043 and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/201010/14/201010/14/2010APASS
DetailsMike Jordan
please call 1/2 hour before. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin
DOC - Permit Finaled10/14/201010/14/201010/14/2010PPASS
DetailsMike Jordan
Certificate of occupancy was issued.
BLD-Aging Inspection9/1/20109/1/20109/2/2010 PASS
DetailsMike Jordan
BLD-Aging Inspection6/29/20106/29/20106/29/2010 PASS
DetailsMike Jordan
work is in progress.
BLD-Energy code compliance4/28/20104/28/20104/28/2010PPASS
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in4/28/20104/28/20104/28/2010PPASS
DetailsMike Jordan
jim Phone #: ###-####. Framing issues have been repaired.
BLD-Framing/Rough-in4/27/20104/27/20104/27/2010PNR
DetailsMike Jordan
BLD-Energy code compliance4/27/20104/27/20104/27/2010PNR
DetailsMike Jordan
BLD-Energy code compliance4/27/20104/27/20104/27/2010ANR
DetailsMike Jordan
Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in4/26/20104/26/20104/26/2010AFAIL
DetailsMike Jordan
Inspection requested from web by: James Larkin Phone #: ###-####. Complete lateral bracing, provide additional studs under 2ply girder upstairs. ok to insulate. c/n posted.
BLD-Framing/Rough-in4/14/20104/14/20104/14/2010PPASS
DetailsMike Jordan
Jim-Fire wall inspection please Phone #: ###-####. Verified fire rated plywood at laydown parapet at roof deck and also at overbuild areas.
BLD-Framing/Rough-in4/13/20104/13/20104/13/2010PPASS
DetailsMike Jordan
Base layer of 5/8 type x rock from ceiling to roof deck.
BLD-Framing/Rough-in4/7/20104/7/20104/7/2010PNR
DetailsMike Jordan
Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in4/6/20104/6/20104/6/2010PNR
DetailsMike Jordan
BLD-Framing/Rough-in4/6/20104/6/20104/6/2010ANR
DetailsMike Jordan
firewall constructoin Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in4/2/20104/5/20104/5/2010PCANC
DetailsMike Jordan
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in3/30/20103/30/20103/30/2010PPASS
DetailsMike Jordan
Base and face layers of 5/8 typex rock for 2hr. firewall, remaining side, 2nd. floor.
BLD-Framing/Rough-in3/29/20103/30/20103/30/2010APASS
DetailsMike Jordan
Base and face layers of 5/8 type x rock for 2hr. firewall, 2nd. flloor, one side only.
BLD-Framing/Rough-in3/29/20103/29/20103/29/2010PNR
DetailsMike Jordan
firewall Inspection requested from web by: James Larkin Phone #: ###-####. Will reschedule for am inspection.
BLD-Framing/Rough-in3/25/20103/26/20103/26/2010PNR
DetailsMike Jordan
Firewall construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in3/22/20103/22/20103/22/2010APART
DetailsJim Sly
Firewall construction Inspection requested from web by: James Larkin Phone #: ###-####
WIP Firewall OK so far.
BLD-Framing/Rough-in3/19/20103/19/20103/19/2010PPASS
DetailsMike Jordan
Jim Fire wall construction Phone #: ###-####.base and face layers of 2hr. firewall, 1st. floor.
BLD-Framing/Rough-in3/18/20103/18/20103/19/2010PPASS
DetailsMike Jordan
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. wrong entry on privious inspection. Base and face layers ok.
BLD-Framing/Rough-in3/17/20103/17/20103/17/2010APASS
DetailsMike Jordan
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Face layer, both sides of 5/8 type x rock for 2hr. firewall. 1st. floor completed. Inspected base layer on remaining side yesterday.
BLD-Framing/Rough-in3/16/20103/16/20103/17/2010PPART
DetailsMike Jordan
Fierwall Construction Inspection requested from web by: James Larkin Phone #: ###-####. 5/8 type x rock, baselayer, other side for 2hr. firewall.
BLD-Footing3/9/20103/10/20103/10/2010APASS
DetailsMike Jordan
bill Phone #: ###-####. Interior footings and column pad footings ok.
BLD-Energy code compliance3/8/20103/8/20103/8/2010PPASS
DetailsMike Jordan
Foundation insulation at garage wall Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Energy code compliance3/2/20103/3/20103/3/2010APASS
DetailsMike Jordan
insulation at foundation perimeter Inspection requested from web by: James Larkin Phone #: ###-####. Rigid foam insulation at interior side of stemwall.
BLD-Foundation2/26/20103/1/20103/1/2010PPASS
DetailsMike Jordan
James Phone #: ###-####
BLD-Footing2/25/20102/26/20102/26/2010PPASS
DetailsMike Jordan
Inspection requested from web by: James Larkin Phone #: ###-####.. Perimeter footing only.