BLD-Final | 8/17/2010 | 8/17/2010 | 8/17/2010 | P | PASS |
Mike Jordan
|
|
|
please call 1/2 hour before Phone #: ###-#### >> Inspection requested via web by James Larkin
|
DOC - Permit Finaled | 8/17/2010 | 8/17/2010 | 8/17/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of occupancy was issued.
|
BLD-Aging Inspection | 8/16/2010 | 8/16/2010 | 8/17/2010 | | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 6/10/2010 | 6/11/2010 | 6/11/2010 | P | NR |
Mike Jordan
|
|
|
please call 1/2 hr before. Thanks jim Inspection requested from web by: James Larkin Phone #: ###-####. Needs zoning.
|
BLD-Other | 4/21/2010 | 4/21/2010 | 4/21/2010 | P | PASS |
Mike Jordan
|
|
|
House Wrap Inspection requested from web by: James Larkin Phone #: ###-####. Insected installation of exterior weather membrane.
|
BLD-Energy code compliance | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 4/16/2010 | 4/16/2010 | 4/16/2010 | P | PASS |
Mike Jordan
|
|
|
Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD-Framing/Rough-in | 4/16/2010 | 4/16/2010 | 4/16/2010 | P | PASS |
Mike Jordan
|
|
|
Inspection requested from web by: James Larkin Phone #: ###-####. Framing issues have been resolved.
|
BLD-Energy code compliance | 4/15/2010 | 4/15/2010 | 4/15/2010 | P | NR |
Mike Jordan
|
|
|
Inspection requested from web by: James Larkin Phone #: ###-####. Framing issues have not yet been resolved.
|
BLD-Framing/Rough-in | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | FAIL |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Provide 36 inches at landings, bearing blocks at girder in garage, nail off all simpson hangars, complete lateral bracing. Provide 4 8d nails on all straps installed on either side.
|
BLD-Framing/Rough-in | 4/8/2010 | 4/8/2010 | 4/8/2010 | A | CANC |
Mike Jordan
|
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 | A | PASS |
Mike Jordan
|
|
|
Firewall at overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
|
BLD-Framing/Rough-in | 3/25/2010 | 3/26/2010 | 3/26/2010 | A | PASS |
Mike Jordan
|
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Face and base layers of 5/8 typex rock for 2hr. firewall, remaing side, 2nd floor.
|
BLD-Framing/Rough-in | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PASS |
Mike Jordan
|
|
|
Base and face layer of 5/8 type x rock for 2hr. firewall, one side only, 2nd. floor.
|
BLD-Framing/Rough-in | 3/24/2010 | 3/24/2010 | 3/24/2010 | P | PASS |
Mike Jordan
|
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. BAse and face layer of 5/8 type x rock for 2hr. firewall at 2nd floor, one side.
|
BLD-Framing/Rough-in | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | PASS |
Mike Jordan
|
|
|
Jim Fire wall construction Phone #: ###-####.base and face layers of 2hr. firewall, 1st. floor.
|
BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 | P | PASS |
Mike Jordan
|
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####.Meeting with framing contractor to discuss firewall transition from single story to two story units.
|
BLD-Framing/Rough-in | 3/16/2010 | 3/16/2010 | 3/17/2010 | P | PART |
Mike Jordan
|
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. base layer of5/8 type x rock for 2hr. firewall, other side.
|
BLD-Footing | 3/10/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####. Interior footings and column pad footings.
|
BLD-Energy code compliance | 3/8/2010 | 3/8/2010 | 3/8/2010 | P | PASS |
Mike Jordan
|
|
|
foundation insulation at garage wall Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD-Energy code compliance | 3/4/2010 | 3/4/2010 | 3/4/2010 | P | FAIL |
Mike Jordan
|
|
|
Foundation Insulation Inspection requested from web by: James Larkin Phone #: ###-####. Needs to install rigid insulation at common wal with garage. c/n issued.
|
BLD-Foundation | 2/26/2010 | 3/2/2010 | 3/2/2010 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Footing | 2/26/2010 | 3/1/2010 | 3/1/2010 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Footing | 2/25/2010 | 2/26/2010 | 3/1/2010 | P | NR |
Mike Jordan
|
|
|
Inspection requested from web by: James Larkin Phone #: ###-####
|