Permit NumberBLD10-00268
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 671 S PINE TREE LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1,398 sq. ft. Townhouse with 3 bedrooms, 2 1/2 bathrooms, approximately 40 sq. ft. of covered patio/porch and a 431 sq. ft. attached garage. All work to be done per the approved plans, plan review report and any notations. R-2 zoning, DRH08-00043 and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/7/20111/7/20111/7/2011APASS
DetailsMike Jordan
please call 1/2 before Phone #: ###-#### >> Inspection requested via web by James Larkin
DOC - Permit Finaled1/7/20111/7/20111/7/2011PPASS
DetailsMike Jordan
Certificate of occupancy was issued.
BLD-Aging Inspection1/3/20111/3/20111/4/2011 PASS
DetailsMike Jordan
Needs to call for final.
BLD-Final11/2/201011/2/201011/2/2010PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin. Needs electrical final.
BLD-Aging Inspection9/16/20109/16/20109/17/2010 PASS
DetailsMike Jordan
work in progress.
BLD-Energy code compliance5/18/20105/18/20105/18/2010PPASS
DetailsMike Jordan
please call 1/2 hour before Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in5/18/20105/18/20105/18/2010PPASS
DetailsMike Jordan
please call 1/2 hour before Inspection requested from web by: James Larkin Phone #: ###-####. All framing issues were resolved.
BLD-Framing/Rough-in5/14/20105/14/20105/14/2010PPART
DetailsJim Sly
Jim Phone #:
OK to insul......C/N
BLD-Framing/Rough-in4/28/20104/28/20104/28/2010PPASS
DetailsMike Jordan
jim\\fire wall construction Phone #: ###-####. 5/8 typex rock for 1hr. firewall at garage.
BLD-Framing/Rough-in4/27/20104/27/20104/27/2010PPASS
DetailsMike Jordan
Base and face layers of 5/8 type x rock for 2hr. firewall, bothsides, 2nd. floor.
BLD-Framing/Rough-in4/27/20104/27/20104/27/2010PPASS
DetailsMike Jordan
Base and face layers of 5/8 type x rock for 2hr. firewall, bothsides, 2nd. floor.
BLD-Framing/Rough-in4/26/20104/27/20104/27/2010APASS
DetailsMike Jordan
BAse layer of 5/8 type x rock for 2hr. fire wall, one side only, 2nd. floor.
BLD-Framing/Rough-in4/26/20104/26/20104/26/2010PNR
DetailsMike Jordan
BLD-Framing/Rough-in4/26/20104/26/20104/26/2010ANR
DetailsMike Jordan
Firewall construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD-Framing/Rough-in4/23/20104/23/20104/23/2010APASS
DetailsMike Jordan
Face layer of 5/8 type x rock for2hr. firewall, both sides, 1st. floor.
BLD-Framing/Rough-in4/22/20104/22/20104/22/2010PPASS
DetailsMike Jordan
jim - for firewall construction Phone #: ###-####. Base layer of 5/8 type x rock for 2hr. firewall, both sides, 1st. floor.
BLD-Footing3/19/20103/19/20103/19/2010PCANC
DetailsMike Jordan
bill Phone #: ###-####
BLD-Foundation3/17/20103/17/20103/17/2010PPASS
DetailsMike Jordan
Interior footings and column pad footings.
BLD-Energy code compliance3/15/20103/15/20103/15/2010APASS
DetailsMike Jordan
Foundation Insulation Inspection requested from web by: James Larkin Phone #: ###-####. rigid insulation at interior side of stemwall. ok.
BLD-Foundation3/11/20103/12/20103/12/2010ACANC
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing3/10/20103/11/20103/11/2010ACANC
DetailsMike Jordan
bill Phone #: ###-####
BLD-Foundation3/11/20103/11/20103/11/2010APASS
DetailsMike Jordan
bill Phone #: ###-####. Stemwall ok.
BLD-Footing3/10/20103/10/20103/10/2010PPASS
DetailsMike Jordan
Bill Phone #: ###-####. Perimeter footings ok.